Pontoon Bailey bridge/Temporary Steel Bridge

Brand Name:Great Wall
Certification:ISO,CE,SGS
Minimum Order Quantity:1 set
Delivery Time:Depending on the quantity
Payment Terms:L/C, T/T
Place of Origin:China
Contact Now

Add to Cart

Active Member
Location: Zhenjiang Jiangsu China
Address: NO. 103, Nanxu Road, Zhenjiang,Jiangsu,China
Supplier`s last login times: within 16 hours
Product Details Company Profile
Product Details

Pontoon Bailey bridge is similiar to standard bailey bridge actually;Its special feature is that the supports are made from pontoons.It has the advantages of fast-installed,easy-dismantled,parts-interchangeable,etc.
It is widely used in the military transportation,emergency earthquake and flooding relief work and road,bridge,railways construction,etc.


NameBailey pontoon bridge
Aliasassembled pontoon bridge; assembled highway steel bridge, steel bridge, steel trestle bridge; temporary pavement; temporary bridge; Bailey bridge;
Model321; 200; GW D;
Commonly used truss plate models321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc.
Maximum single span of steel bridge designabout 60 meters
Standard lane width of steel bridgesingle lane 4 meters; double lane 7.35 meters; design according to demand.
Load ClassAutomobile Class 10; Vehicle Class 15; Vehicle Class 20; Track Class 50; Trailer Class 80; Bicycle 40 tons; AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian Standard Class-40; Australian Standard T44; Korean Standard D24, etc. Tail
Design schemeAccording to the different spans and loads, choose the appropriate arrangement and floating box scheme.
Main Material of Steel BridgeGB Q345B
Connection pin material30CrMnTi
Connection bolt grade8.8 grade high strength bolt; 10.9 grade high strength bolt.
Surface anti-corrosionhot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc.
Bridge erection methodshoisting method; floating method, etc.
Installation time30-60 sunny days after abutment and other conditions are met (determined by bridge length and site conditions)
Installation requirements15-20 workers (determined according to site conditions)
Installation equipmentcrane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions)
Features of steel bridgeNo need to be pier, interchangeable, removable, long service life

China Pontoon  Bailey bridge/Temporary Steel Bridge supplier

Pontoon Bailey bridge/Temporary Steel Bridge

Inquiry Cart 0