

Add to Cart
Semi - Auto Memory PU Foam Making Machine For Foaming Mattress and Sofa
ZHF-2017-7 Semi-Auto Foam Making Machine
Main technique specification:
1, Dimension:L2.8 m×W1.5m×H2.5m
2, Foam mould size(can be adjusted): W1500-2000×L2000-3000×H1200
two sets
3, Foaming material Group: 7 groups, man-machine interface control
4, Foaming height: Max 1200mm
5, Foaming density: 8Kg/m³~100kg/m³
6, Foaming speed: 2000r/min~7000r/min
7, Max total output:230L/time
8, Mixing –head motor: 11kw
9, Total power: About 43 kw
Main collocates and material chooses:
Material pot types: (The work pressure in the pot is normal
pressure)
Type | Use | Specification | Qty |
Big material tank | PPG+mixture material | 3m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | TDI | 2m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | MC | 1m³/δ2mm stainless steel | 1 |
Small material tank | Si,T9,A33,Color | 80L/δ1mm stainless steel | 4 |
Transducer Types
Model | Power/kw | Use | Qty | Brand |
VFD-B | 11 | Mixing head | 1 | Delta |
VFD-B | 5.5 | PPG | 1 | Delta |
VFD-B | 3.7 | TDI | 1 | Delta |
VFD-B | 2.2 | MC | 1 | Delta |
VFD-B | 1.5 | Si,T9,A33,Color | 4 | Delta |
Motor types:
Model | Power/kw | Use | Qty | Brand |
Y200L-2 | 11 | Mixing head | 1 | Guangdong |
Y132S-4 Horizontal | 7.5 | PPG | 1 | Guangdong |
Y132S-4 Horizontal | 3.7 | TDI | 1 | Guangdong |
Y100-4 Horizontal | 2.2 | MC | 1 | Guangdong |
Y100-6 Horizontal | 1.5 | Ann, Si, Tin, Color, | 4 | Guangdong |
Y100-4 Vertical | 2.2 | PPG material mixing | 1 | Guangdong |
Y100-4 Vertical | 1.5 | TDI Mixing | 1 | Guangdong |
Y100-4 Horizontal | 2.2 | PPG mixing | 1 | Guangdong |
Y100-4 Horizontal | 2.2 | TDI filing | 1 | Guangdong |
Our Services
We will help to design the layout of the machine that put in your
factory.
We will send 2-4 experience engineers to install and testing the
machines.
We will teach your engineer how to operate the machine and how to
maintain the machines.
We will give you the machine operation manual and the best
formulation for target products that you are going to make.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer
help to install the machine you must send someone to help about 30
days installation will finished. After that one electrician and one
foaming engineer will come to connecting the cable and run the
machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to
pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the
testing?
A: We will send you a list for the tools that you need to prepare
for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in
our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your
factory but you need to discuss the salary and all details with
him.
Q:During the foaming if we have some problems abt the foam and the
machine how can we do?
A: You can just call our after sale manager explain for the
situation or send some picture we will help to handle within
24hours.