

Add to Cart
Produce Recycled Foam with Foam Crush Machine Crush Waste Foam into
Pieces
Machine features:
1) The machine is driven by a motor spindle rotation, so that the materials will be broken particles by hammer(without secondary crushing) .
2) Particle sucked out by fan through the discharging mouth eduction.
3) Easy to packing by collection of powder and high pressure air separation.
Product Description
ZHZS-Q1 /Q2 foam crush machine
The machine is mainly used to crush waste foam into pieces for the
fillings of pillows,sofas and toys,it also used to produce recycled
foam,it has compact structure and high productivity.
[Specifications]
Model | ZHZS-Q1 | ZHZS-Q2 |
Breaking speed | 100kg/h | 100-130kg/h |
Breaking particulate min | 3~20mm | 3~20mm |
(8mm,18mm,30mm)Screen | / | 3pcs |
Fan machine (4kw) | / | |
Total power | 11kw 22kw | |
Machine weight | 2000kg | 2200kg |
Machine external size | L1250×W570×H1250mm | L2930×W1100×H1070mm |
Marks: | |||||
1. According to seller's standard designed drawing diagrame to arrange the production and inspection. | |||||
2. if customer reqiure, techincians will be sent by seller, and the turn-round tickets fee, vise fee, $40 per day of allowance fee and hotel accommodation are in charge of buyer. | |||||
3. Payments Terms: T/T 30% advance before production.the balance of total amount 70% will be paid before shippment (The bank charge for buyer's account). | |||||
4. Delivery forms: Send to ShenZhen Seaport | |||||
5. Spare parts: Offer assorted maintain tools. | |||||
6. Package: paper & film package. | |||||
7. Voltage: all the eqiupments are: 380V, 50HZ, 3P.(Voltage can be changed, but price need to increase 3%) | |||||
8. Delivery date: 45 days (after seller get the advance). | |||||
9. All the machines maintain for one year, if the damages caused by machine itself, excluding the man-made accidents, the broken parts offered by seller in free of charge, but the transport cost for buyer's account. |
Remark: The above only for reference. All the data is subjected to
sold production.
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be
pack in wooden case. Others will be simple pack with paper or foam
sheet with plastic film.
We will try the best way to pack all the machine well and also save
the freight cost.
Our Services
We will help to design the layout of the machine that put in your
factory.
We will send 2-4 experience engineers to install and testing the
machines.
We will teach your engineer how to operate the machine and how to
maintain the machines.
We will give you the machine operation manual and the best
formulation for target products that you are going to make.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1 engineer
help to install the machine you must send someone to help about 2
days installation will finished and the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to
pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the
testing?
A: We will send you a list for the tools that you need to prepare
for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in
our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your
factory but you need to discuss the salary and all details with
him.
Q:During the foaming if we have some problems abt the foam and the
machine how can we do?
A: You can just call our after sale manager explain for the
situation or send some pictures we will help to handle within
24hours.
You are warmly welcome come and visit our factory.