Add to Cart
Foam Horizontal Drilling Machine Necessary Ancillary Facilities of
Circular Foam Cutting Machine
2. The bearing is imported from NSK.
3. With fast speed of cutting which is efficient,
4. Gurantee no mark while keep the speed.
5. The wheel is aluminium wheel with skim coating,etc.
This machine is mainly used for the drilling work of circular
foam,it is a necessary ancillary facilities of circular foam
cutting machine.
MODEL | ZHZK-45A | ZHZK-45B |
Punching diameter | 45mm | 45mm |
Principal axis turning speed | 230r/min | 230r/min |
Machine external size | Φ2000*2200mm | Φ2000*2200mm |
Power | 1.5kw | 1.5kw |
Machine weight | 800kg | 1200kg |
Machine size | L5700 * W1350 * H1800mm | L1400 * W2300 * H15500mm |
Marks: | |||||
1.According to seller's standard designed drawing diagrame to arrange the production and inspection. | |||||
2. if customer reqiure, techincians will be sent by seller, and the turn-round tickets fee, vise fee, $40 per day of allowance fee and hotel accommodation are in charge of buyer. | |||||
3. Payments Terms: T/T 30% advance before production.the balance of total amount 70% will be paid before shippment (The bank charge for buyer's account). | |||||
4. Delivery forms: Send to ShenZhen Seaport | |||||
5. Spare parts: Offer assorted maintain tools. | |||||
6. Package: paper & film package. | |||||
7. Voltage: all the eqiupments are: 380V, 50HZ, 3P.(Voltage can be changed, but price need to increase 3%) | |||||
8. Delivery date: 45 days (after seller get the advance). | |||||
9. All the machines maintain for one year, if the damages caused by machine itself, excluding the man-made accidents, the broken parts offered by seller in free of charge, but the transport cost for buyer's account. |
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1 engineer
help to install the machine you must send someone to help about 2
days installation will finished and the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to
pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the
testing?
A: We will send you a list for the tools that you need to prepare
for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in
our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your
factory but you need to discuss the salary and all details with
him.
Q:During the foaming if we have some problems abt the foam and the
machine how can we do?
A: You can just call our after sale manager explain for the
situation or send some pictures we will help to handle within
24hours.