Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line

Brand Name:ZHMACH
Certification:CE
Model Number:ZHF-2018
Minimum Order Quantity:one set
Delivery Time:50-60 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Supplier`s last login times: within 30 hours
Product Details Company Profile
Product Details

Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line


Product Description

The Foam Production Line is a automatic continuous foaming machine for producing flexible polyurethane foam used in furniture, shoe material, packing, electron, garment and transportation industrial. It’s the ideal production equipment for large-scale foaming


For the process of foaming


Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process


Max.Output Capacity200~350kg/min(Continuous Type)
Mixer Total Power37kw
Max.Mixing Speed2500~6000r/min
Foaming TypeTrough & Sprayer
Standard Material Q.T.Y.13 Groups.
Foaming SizeW2300mm*H1300mm(Width Adjustable)
Control SystemPLC Digital Touch Screen
PPG Tank5Ton*1Set.
POP Tank5Ton*1Set.
TDI Tank5Ton*1Set.
MC Tank2Ton*1Set.
Caco3 Tanks5Ton*1Set
T-9/Amine/Color 1ABCD/ Silicone /Water Tanks180L*8Sets
Side Wall SizeL16m*H1200mm
Fall plateL8.5m*W0.98~2.4m(Adjustable)
Foaming PlatformL2000mm*W3000mm*H700mm
Conveyor LineL16.9m
Side/Bottom Paper Feed & Rewind System2Sets.
WalkwayW500mm*L15m
Air ValvesU.S. Standard
Chiller(Both Cooling & Heating System)1Set*1.5HP
R.S.Pulling System1Set.
Foaming Density Range8~150kg/Cubicmeter.
Match With Block Cutter1Set.
Total Motor PowerApprox 125kw.
Machine N.W.Approx 30 Ton
Floor Space RequiredL45m*W5m*H4.5m.

Packaging & Shipping

1. The Foam machine sponge making machine nacked packing and some spares parts we will pack in the wooden case also in order to save the place we will also put some parts into the material tanks.


2.Then we can save the cost of shippment and for one 13groups machine we need 2*40HQ+1*20GP three containers only


Our Services

1.We will help to design the layout of the machine that put in your factory.We will send 2-4 experience engineers to install and testing the machines.


2.We will teach your engineer how to operate the machine and how to maintain the machines.


3.We will give you the machine operation manual and the best formulation for target products that you are going to make.


4.We will help to buy the best raw material for making the foam if you needed.


FAQ

Q: How many days for the install and testing of the machine?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.


Q: For the cost of the engineer how much I need to pay?

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.


Q:What kind of raw material tools we need to prepare for the testing?

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.


Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.


Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.




automatic foaming machine line.pdf

China Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line supplier

Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line

Inquiry Cart 0