

Add to Cart
Quick Detail of PU Foam Making Machine
ZHQG-YM03 Discharge pressure sponge machine
1,Pressure sponge size: 1250mm
2,Pressure thickness:0-200mm
3,Pressure foaming speed:0-60m/min(Frequency converter timing)
4,The diameter of the upper pressure roller:400mm.There are six
groups of upper pressure rollers. Each pressure roller group
consists of 11 pressure rollers forming a wheel sheet, evenly
distributed. These two groups are staggered at intervals of 36
5. The lower press rollers are 260 mm in diameter, in six groups.
The spacing is equal to that of the upper rollers and is opposite
to the upper rollers. The rollers are equipped with a sponge
conveyor belt, specification: W1250 * 4498mm (ring belt)
6,Outfeed conveyor frame: W1250 *L360mm
7,Exterior dimensions of machine:Ll2500 * W1960 * H1400mm
8,Total power:7.5KW
Main collocates and material chooses:
Material pot types: (The work pressure in the pot is normal
pressure)
Type | Use | Specification | Qty |
Big material tank | PPG+mixture material | 3m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | TDI | 2m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | MC | 1m³/δ2mm stainless steel | 1 |
Small material tank | Si,T9,A33,Color | 80L/δ1mm stainless steel | 4 |
Transducer Types
Model | Power/kw | Use | Qty | Brand |
VFD-B | 11 | Mixing head | 1 | Delta |
VFD-B | 5.5 | PPG | 1 | Delta |
VFD-B | 3.7 | TDI | 1 | Delta |
VFD-B | 2.2 | MC | 1 | Delta |
VFD-B | 1.5 | Si,T9,A33,Color | 4 | Delta |
Motor types:
Model | Power/kw | Use | Qty | Brand |
Y200L-2 | 11 | Mixing head | 1 | Guangdong |
Y132S-4 Horizontal | 7.5 | PPG | 1 | Guangdong |
Y132S-4 Horizontal | 3.7 | TDI | 1 | Guangdong |
Y100-4 Horizontal | 2.2 | MC | 1 | Guangdong |
Y100-6 Horizontal | 1.5 | Ann, Si, Tin, Color, | 4 | Guangdong |
Y100-4 Vertical | 2.2 | PPG material mixing | 1 | Guangdong |
Y100-4 Vertical | 1.5 | TDI Mixing | 1 | Guangdong |
Y100-4 Horizontal | 2.2 | PPG mixing | 1 | Guangdong |
Y100-4 Horizontal | 2.2 | TDI filing | 1 | Guangdong |
Our Services
We will help to design the layout of the machine that put in your
factory.
We will send 2-4 experience engineers to install and testing the
machines.
We will teach your engineer how to operate the machine and how to
maintain the machines.
We will give you the machine operation manual and the best
formulation for target products that you are going to make.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer
help to install the machine you must send someone to help about 30
days installation will finished. After that one electrician and one
foaming engineer will come to connecting the cable and run the
machine in 15days. Total 45days the machine can be running.