

Add to Cart
Specifications of Leroy Somer R438 AVR Original Replacement for Brushless Generator
1. Directly Manufacturer
2. Over 15 years experience in generator field
3. OEM Service
LEROY SOMER R438 AVR Original Replacement Automatic Voltage
Regulator is built to fully replace the original version, same fit,
form and function
For both AREP & PMG excitation systems, the alternator voltage
regulator is the R438.With AREP excitation,
the R438 electronic AVR is powered by two auxiliary windings which
are self-sufficient of the voltage match circuit. The first winding
has a voltage in proportion to that of the alternator
(characteristic Shunt), the second has a voltage in proportion to
the stator current (compound characteristic: Booster effect).
The power supply voltage is rectified and filtered before being
used by the AVR monitoring transistor. This principle ensures that
regulation is not unnatural by distortions generated by the load.
This excitation system consists of a "PMG" (permanent magnet
generator). This is fitted at the rear of the machine and connected
to the R438 AVR.
General Characteristics
> Voltage regulation +/- 0.5 % at steady state and constant
speed.
> Phase to phase voltage sensing.
> Control by transistor means the regulation quality is
independant of load applied.
> Integrated "LAM" system to cope with increased loads applied
to the engine
> Suitable for high levels of vibration and harsh environments.
> The R 438 is compatible with other modules giving additional
functions.
> Standard power supply: AREP or PMG.
> Rated overload current: 8 A - 10 s
> Electronic protection (overload, shortcircuit on opening of
voltage sensing circuitexcitation overload current for 10 seconds
then return to approximately 1A.
> Fuse : F1 on X1, X2. 8A ; slow - 250V
> Voltage sensing : 5 VA isolated via transformer;
> 0-110 V terminals = 95 to 140 V,
> 0-220 V terminals = 170 to 260 V,
> 0-380 V terminals = 340 to 520 V.
> Voltage regulation ± 1%.
> Normal or rapid response time via ST2 jumper
> Voltage adjustment via potentiometer P2
> Current sensing (parallel operation): C.T. 2.5 VA cl1,
secondary 1 A (optional).
> Quadrature droop adjustment via potentiometer P1
> Max. excitation current adjustment via P5
Depending on various circumstances, three different delivery
methods have been taken: by sea, by air cargo and by express
service.
*By sea. This is the most economical way of delivery. Suit for big quantity
order, the delivery cost dramatically low and assist you in
achieving maximum profit. It normally would take about one month
for cargoes to reach their destination port.
*By air cargo. The advantage of air cargo is it costs much less time than
delivery by sea. Generally it would take about one to two weeks for
cargo reaching its destination.
*By express service. It is the most expensive way of delivery, but it is really quick
and convenient. Normally this door to door service can deliver the
goods to your company only in 3-5days. Fortunately, we have signed
big discount contract with most express companies, such as TNT, DHL
and UPS, to help our customers cut their delivery expenditure.
In most situations, we accept T/T (telegraphic transfer or wire
transfer) as the main payment method for normal orders. There are
other different payment methods which are listed below:
T/T(telegraphic transfer): For order value which is lower than 3000 USD, 100% payment need to
be made in advance. For order value which is higher than 3000 USD,
30% deposit need to be made in advance and the balance should be
transferred when cargo is ready for delivery.
Western union: western union could be accepted only when the cargo sent by
express service and do not need clear the custom in China.
PayPal: only be accepted for easy buy customers who delivery the goods by
express service and do not need clear the custom in China.
After you transferred the deposit or complete payment of an order,
please remember to send the copy of bank slip to our sales
personnel by either e-mail or fax as the evidence of payment.
1. Our warranty period is 12 months from the date when the goods have been notified as ready for despatch by us.
2. During the guarantee period, we will repair or replace any damage that under proper use appears in the goods, except for the incorrect operation.
Tony (Export Manager)
Skype: benjamin-hua
Email: info@alternator-avr.com
Web: http://www.alternator-avr.com