

Add to Cart
1 Process
Steel pipe collection-Feeding and turnover device - Transfer roller (chain) in front of painting machine-Painting machine -Post painting transfer chain-horizontally moving mechanism -Air drying bed-marking -Packing and shipment
High-pressure mist spraying machine is used for oiling, and the
steel pipe is sprayed through the inner cylinder, and 6 spray guns
are installed on the inner cylinder in a 360° direction to realize
the oiling of the outer wall of the steel pipe.
The spray mark adopts the gantry beam type spray mark, the steel
pipe is on the drying bench, and the large gantry beam spray mark
bracket with the nozzle moves linearly along the steel pipe to
realize the steel pipe spray mark.
The exhaust gas treatment adopts the catalytic combustion treatment
system using the "dry paint mist filter + activated carbon
adsorption and desorption concentration + catalytic combustion"
treatment process, which can effectively treat the exhaust gas
pollutants generated by the spray booth, such as toluene, xylene,
and non-methane total hydrocarbons.