Industrial Prefab Steel Structure Warehouse Frame Construction Building

Brand Name:GST
Certification:ISO 9001, CE certificate of quality system
Model Number:Steel Structure Warehouse
Minimum Order Quantity:800 square meter
Delivery Time:25-35 work days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Site Member
Location: Qingdao China
Address: No.702 Shanhe road, Chenyang district, Qingdao City, China.
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

Industrial Prefab Steel Structure Warehouse Frame Construction Building
About This Steel Structure Warehouse Building

--Roof design

Double slope single ridge
The roof slope is 10%, and the outer gutter + φ110UPVC forms a roof drainage system, which can cope with the rainy season
Roof method: 0.4MM color steel plate + 50mm glass wool + steel wire mesh

Classic Ventilator Advantages
1. No electricity, 24/7 operation, zero operating costs, saving resources.
2. High sensitivity, no noise, rainproof, sturdy and durable.
3. Parts can be replaced by customers, easy to install and easy to maintain.
4. The appearance is compact and elegant.

--Wall design


Wall method: 0.4MM color steel plate + 50mm glass wool + steel wire mesh

4m*3.6m(2),sliding door with canopy, canopy above each door to play the role of sunshade and rain shelter.

Fixed long window, 48m*1m(2), no lower window, in the case of ensuring ventilation and lighting, the cost is saved.



The Details of This Steel Structure Warehouse



site condition

Project locationwind load (m/s)function


Ethiopia

Warehouse


size

length (M)width (M)height (M)


50

256


crane request

crane tons (T)lifting height (M)crane quantity (set)


No

NoNo


wall request

brick wall height (M)insulationgutter


1.2m

NoYes


roof request

insulationskylightventilation


Yes


No

Yes


door & window

the quantity and size of door (M)the size of lower window (M)the size of upper window (M)


4m*3.6m(2)

No48m*1m(2)





Advantages of steel construction

Prefab steel Structure workshop buildings are used for industrial production in which all steel structures are painted and then delivered to the project site for installation. And because the steel structure can be manufactured in the factory and installed on-site, the construction time is significantly reduced. Due to the steel it can dramatically reduce construction waste and is more environmentally friendly. Therefore, it widely used in industrial buildings and civil buildings.


Our company

QINGDAO GUSITE CONSTRUCTION ENGINEERING CO.,LTD

With many years of steel structure export experience and steel structure construction experience, it can provide a series of services from design to production to on-site installation to after-sales.


Each steel component will be numbered in detail at the time of delivery, and complete and detailed installation instructions and construction process instructions will be provided. If the customer needs, we can also send overseas construction teams or construction workers to assist in the installation.



Possess the foreign contracted project management qualification certificate issued by the Ministry of Commerce of China, CE certification [EN1090 certificate], IS09001 certificate, etc.


Production Capacity

Our company:QINGDAO GUSITE CONSTRUCTION ENGINEERING CO.,LTD


The company has:


2 composite board production lines


more than 1 million meters/year

5 color steel plate production lines


2 million meters/year

2 H-type steel CNC production lines


20000 tons/year

1 C-type steel production line


2500 tons/year

1 Z-steel production line


2,000 tons/year





























































China Industrial Prefab Steel Structure Warehouse Frame Construction Building supplier

Industrial Prefab Steel Structure Warehouse Frame Construction Building

Inquiry Cart 0