SE Development Assistance Service/Automotive EPC

Brand Name:CEI-Kinte
Certification:ISO9001/FEM/ISO14001/OHSAS 18001
Model Number:Customized
Minimum Order Quantity:Negotiable
Delivery Time:According to customer's requirement
Payment Terms:Negotiable
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou China
Address: No.16 Yufeng Road Shiling Town Huadu District Guangzhou, China
Supplier`s last login times: within 26 hours
Product Details Company Profile
Product Details

ASSISTANCE IN DEVELOPING SE


SE Team Overview

PositionNumber of employees1-3 years of industrial experienceNumber of employees3-5 years of industrial experienceNumber of employees5-8 years of industrial experienceTotal
Technical Director//55
Step Simulation85316
Mechanical Design126321
Layout2215
Associate Technologies/213
PD Expert/2/2
Conveyor Expert/112
Data Management2//2
List of Special Standards1124

SE Service and Deliverables

SE is divided into four phases: punching SE, welding SE, coating SE and assembling SE. We mainly provide the development assistance service related to welding Simultaneous Engineering, the service contents of which are as follows:


PhaseItemDescriptionDeliverables
Phase-I Engineering DesignAnalysis of assembly processFeasibility Analysis of Welding ProcessAnalysis Report for Assembly of Welding Parts
Interference inspection of parts assembly
Feasibility analysis of welding processDefine parts connection mode (steel spot welding, aluminum spot welding, CO2 shielded welding, SPR, FDS, Flexweld, Bolt, etc.)Report for Feasibility Analysis of Welding Process
Analysis and determination of the quantity, size and surface quality of welding spots
Analysis of welding overlap
Define gluing method and area
Weldability AnalysisAnalyze and optimize the methods of welding between parts (manual welding, automatic welding, robot welding or laser welding, etc.)Weldability Analysis Report
Feasibility analysis of projection welding nut, stud and spot welding
Analysis on the number of welding spots and the human-machine operability of welding parts
Phase-II Engineering DesignPartitioning of car body structureEstablish assembly strategyFamily Tree
Analysis of partitioned sub-assembly structure
Analysis of Positioning and Clamping PointsAnalysis of locating holePLP document
Analysis of locating surface
Definition and analysis of support clamping surface
Welding Process PlanningAnalysis on the loading sequence of partsProcess Planning Scheme
Analyze and optimize the operation content and realization form of each station
Process design (work sequence, welding content, welding position, welding quantity, standard working time, equipment and fixture)
Layout plan and workshop logistics design (define and optimize workshop station layout, process flow and logistics)Layout
Analysis of operation man-hour (analyze the cycle time and balance of each station, define the number of workers at each station and adjust the work content of each station)Cycle Time
Phase-III Engineering DesignSimulationSelection & simulation of robot, welding gun and other process equipmentSimulation
Simulation of joining process accessibility
Logistics simulationSimulation and verification of the cycle time and output of production linePlant Simulation
verification of the buffer quantity between and within production lines
3D design3D structure design3D
Design of conveying (between lines, within lines, equipment switching, etc.)
Multi-vehicle flexible switching assembly structure



China SE Development Assistance Service/Automotive EPC supplier

SE Development Assistance Service/Automotive EPC

Inquiry Cart 0