Product Details
D905 D1005 D1105 D1305 V1305 V1505 Engine Oil Pump 1J050-35070
16241-35070 For KUBOTA Diesel Engines Parts
Applicable models | D905 D1005 D1105 D1305 V1305 V1505 |
Product Name | Oil Pump |
Original number | 1J050-35070 16241-35070 |
Product DescriptionProduct Features
doosan excavator parts
small oil pump
oil transfer pump
oil pressure pump
oil motor pump
automotive oil pump
basic engine parts
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a
construction machinery engine parts company integrating research
and development, agency, domestic and international sales and
e-commerce.
It was the first one to enter the construction machinery parts
market in 1995. It is located in the center of the world's largest
industrial distribution center.
STAR MUSTANG is supported by scientific research and development
strength, new business philosophy, mature marketing team,
development and sales of high quality excavator parts. At present,
STAR MUSTANG covers a wide range, and its products are
characterized by high strength, high toughness, high temperature
resistance, no deformation, high wear resistance, etc. The product
matching different kinds of excavator spare parts, which caters to
the current market demand for high-end accessories.
Including Hydraulics parts, Final Drives parts, Undercarriage
parts, General consumable parts, Engine spare parts, and stuff like
that which are high-qualified products.
RODUCT CATEGORIES
DELIVERY TIME:
We get to start preparing the goods when we receive payment from
you. (The goods will be sent between 48 hours to 72 hours if we
have in stock. The goods will be sent before the delivery time and
the sample will send to you for checking.)
Packaging & Shipping
FAQ
Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring,
cylinder liner, crankshaft.
Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.
Q: How to place orders?
A :The order is from your inqiuries.
1,Confrim PI (the engine model, price, quantity, packing, delivery
time, shipping way, time of payment).
2,You make payment and send us receipt of payment.
3,We get to start preparing the goods when we receive payment from
you. (The goods will be sent between 48 hours to 72 hours if we
have in stock. The goods will be sent before the delivery time and
the sample will send to you for checking.)
4,We would deliver goods after we get balance from you. The order
finish when you get goods and feel satisfied.
Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.
Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade
Assurance,Wire transfer, Western union, Paypal, Cash. (The
production order can be pay 30% deposit first, after we arranged
well, then you pay the balance.)
Q: Could you give guarantee ?
A:Yes, one year warranty.
Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or
our own trademark packing.
Company Profile
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery
Parts Co., Ltd. is one of the earliest companies in the industry to enter the
construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks,
off-highway trucks, forklifts, etc.) engine parts production and
sales companies.
Our main business scope is cylinder blocks, cylinder heads,
crankshafts, full gasket kits, pistons, cylinder liners, piston
rings, master connecting rod bearings, camshafts, camshaft
bushings, thrust washers, connecting rods, connecting rod sleeves
Group, fuel injection pump, oil pump, water pump, fuel supply pump,
lift pump, engine valve series (valve, valve guide, valve seat,
valve spring, valve lock, valve cover, tappet, push rod, cover,
bracket, rocker arm assembly and parts), oil coolers, oil cooler
covers, turbochargers, starters, alternators, fan blades, nozzles,
nozzle sets, engine gears, engine bolts, engine water pipes, engine
oil pipes, etc., covering almost all engines parts.