Lab Single Station Chamber Purification Vacuum Glove Box Battery Equipment Battery Assembly Line

Brand Name:GELON
Certification:CE
Model Number:GN-GN-1
Minimum Order Quantity:1 set
Delivery Time:30 works day
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Site Member
Location: Linyi Shandong China
Address: CN,Shandong,Linyi,Room 1606, Building 1, Jinding International Plaza, Junction Of Hongqi Road And Yimeng Road, Lanshan District
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

Lab Single Station Chamber Purification Vacuum Glove Box Battery Equipment Battery Assembly Line


Function:

Closed Recirculation

The Inert Gases will be closed recirculation by Fan and Cleaner, to continuously remove water and oxygen.

Automatic Control Regeneration

The materials for dehydration and deoxidization can be regeneration by programmed control.

Automatic Cleaning

Gas replacement can be taken by automatic controlled cleaning valve.

Box Pressure ControlPressure inner box has PLC controlling, working pressure (+/- 10mbar) can be freely set and auto-protected (exceeding +/- 12mbar).

Vacuum Pump Auto-control

Vacuum Pump will be auto-opening for systems’demands.

Main Composition and Basic Configuration:

Closed Box (With Gradient Worktop and Dismountable Safe Glass Window), Pass Box, Cycling Scavenging Unit, PLC & Touch Panel, Vacuum System, Display System, Holder, etc.


Index:

Working Voltage
220V AC, 50/60Hz, Single Phase
Max. Power Consumption
3KW
Glove Box Chamber
· Case Material: Stainless Steel 304
· Dimensions: 2400mm(L) x 800mm(W) x 930mm(H)
· 12mm thick double layer laminated safety glass with corrosion protection film for operating in a safe and easy manner

Chamber Condition
· Water concentration: <1 ppm (20°C, 1 atm)
· Oxygen concentration: <1 ppm (20°C, 1 atm)
Leak rate
<0.05 Vol% / hr (Depending on oxygen concentration inside the glove box)

Air-lock Chamber
· Antechamber Dimensions: 385mm(Dia.) x 588mm(L)
· Small Chamber Dimensions (for tools): 150mm(Dia.) x 300mm(L)
· Max. vacuum level: 100 Pa

Working Gas
· Operating gas: Inert gas such as N2, Ar, He
· Regenerating gas: Mixture of H2 (10%) and Operating gas
o For purification system with only water adsorbing function, Regenerating gas will be the same as Operating gas

Gas Purification System
· Automated Regeneration Process
· Automated water and oxygen removal
· Purification Cylinder: made of BASF antioxidant materials and UOP water adsorbent materials
· Moisture removal capacity: 1.5KG
· Oxygen removal capacity: 180L

Filter System
· Organic Solvent Filter System filled with replaceable activated carbon
· Built in HEPA filter can eliminate particle size > 0.3μm
Control system
· Siemens PLC control system with 6" touch screen display
o Water concentration: 0 - 1000 ppm with an accuracy of 0.1 ppm
o Oxygen concentration: 0 - 1000 ppm with an accuracy of 0.1 ppm
o Pressure: -2500 to 2500 Pa with an accuracy of 1 Pa

Pump
· England EDWARDS pump is included for faster vacuum and removing moisture
· Vacuum rate: 8.4 - 12 m^3/hr
Blower
Flow Rate: 90m³/h
Purification Pipeline
304 Stainless Steel, KF40 Port
Gloves
A pair of NORTH butyl glove is included to provide better protection against toxic materials
Lighting
Built in fluorescent lamp

Slidable Shelf
· Three slidable shelves are built 0n top of inside glove chamber with dimensions of 300mm x 250mm
· 300mm away from roof
Product Dimensions
3115mm(L) x 830mm(W) x 1830mm(H) (123" x 33" x 72")
Shipping Dimensions & Weight
Total 2 pallets
#1: 86"x41"x84"
#2: 86"x41"x83"
Total weight 1800 lb


Warranty
· One Year limited warranty with lifetime support
· Rusting and damage due to improper storage condition or maintenance is not covered by warranty
· Gloves are consumable items and are not covered under warranty
Application Notes
· The channel between the glove box chamber and the gas purification system must be unimpeded during the operation of gas
purifying
· Always check the joints, gloves, sealing elements, and pipelines for air-tightness before and during the operation
· Corrosive gases are prohibited as they will damage the water sensor and oxygen sensor
· The inlet and outlet of the Air-lock Chamber must not be opened at the same time to prevent contamination by the external gas
· Coolant water outlet must remain switched on all the time
· System check frequently to replace filters and solvent adsorbents for maintanence and maximum efficiency


What we supply:
1. Full set of lithium battery materials, including :
LiFePO4, LiMn2O4, LTO, LiNiMnCoO2(NMC), LiCoO2, Graphite(MCMB)and Other Cathode&Anode Battery Materials; Aluminum foil, Copper foils, Battery separator,etc.

2. Full set of lithium battery equipment, for example:
mixing machine --coating machine--vacuum oven--rolling machine--welding machine--slitting / cutiing machine --winding machine--sealed machine,etc.

3. Full set of lithium battery technology.
We can design the laboratory and production line according to customer's request.
Any more info, pls kindly contact : mavis@libgroup.net

China Lab Single Station Chamber Purification Vacuum Glove Box Battery Equipment Battery Assembly Line supplier

Lab Single Station Chamber Purification Vacuum Glove Box Battery Equipment Battery Assembly Line

Inquiry Cart 0