Fully Automatic Powder Coating Paint Plant 380V 220V Metal Powder Coating Line

Brand Name:ABD
Place of Origin:Guangdong, China
Packaging Details:Packed in parts and loading into the containers
Supply Ability:30 Set/Sets per Month
Price:Negotiate
Type:Coating Production Line
Contact Now

Add to Cart

Verified Supplier
Location: Foshan Guangdong China
Address: F5-2 ,North Fanhu District ,Leping Central Sanshui Foshan City ,Guangdong Province ,China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Fully Automatic Powder Coating Painting Line

Product Description

This red automatic powder coating line was designed for the customer who supply the powder coating services to the others.

The working process for this line is, loading --- spray type pre-treatment --- water drying --- automatic powder coating --- automatic powder curing --- cooling --- unloading.


Automatic chain system: 2 sets driving system and 2 tensioning system. Chain can bearing 100kg/single point. Chain speed, 2.5m/min (you can adjust according your need). Total length for the chain, 295m


Pre-treatment system: Stainless steel spray type.

Steps are, pre-degreasing --- degreasing --- water washing 1 --- pure water washing 2 --- nano ceremic --- water washing 1 --- pure water washing 2


Automatic water drying oven: this oven only have the temperature for 120 Celsius.


Automatic powder coating booth: the cyclone system will help you to recycle the 99.5% of the powder, and the material is PP type, it can allow you to change the color just in 15min. And the reciprocator and automatic gun will help you to do the automatic powder coating. There will be also 2 manual working station to making up the powder coating for some dead corner.


Automatic powder curing oven: powder curing oven have the temperature for 180~230 Celsius. The work piece can curing 20~30min just according your need.


Work Piece
Work piece name
Fridge, air conditioner, car parts and so on
Work piece max size
2500*800*2000mm (L*W*H)
Front door size
2400*2440mm (W*H)
Max weight per hanger
200kg/hanger
Pre-treatment System
Material for pre-treatment
Stainless steel SUS 304
Working process:
Pre-degreasing --- degreasing --- water washing 1 --- pure water washing 2 --- nano ceremic --- water washing 1 --- pure water
washing 2
Water Drying Oven
Size
30000*1550*6650mm ( L*W*H )
Material
100mm rock wool panel for the oven temperature 120 Celsius
Heating system
1 set natural gas burner, 430000kcal/h, with 1 set 7.5kw high temperature fan.
Powder Coating Booth
Size
7000*2000*3350mm (L*W*H)
Powder recycle system
One cyclone system, 1 set 30kw circulation fan, 24 pieces filter cartridge, 2 sets of automatic reciprocators, automatic gun, manul powder coating gun
Automatic Powder Oven
Size
30000*4850*6650mm (L*W*H)
Material
150mm rock wool panel for the oven temperature 180~230 Celsius
Heating system
2 sets natural gas burner, 600000kcal/h for each, with 1 set 15kw high temperature fan.
The details that show in the above form is just customized for this customer. A lot of details can be adjust according your different situation.
Like the pre-treatment way, according your work piece, factory layout or budget situation, we may also choose the pre-treatment tanks or semi-automatic spray type pre-treatment instead of the autoamtic spray type pre-treatment, shot blasting or sand blasting if there is rust on the surface of your work piece.
In order to make the most right design for you, we need your help to let us know more details about the work pieces as much as you can.
Detailed Image
FAQ

Q1: Are you trading company or manufacturer ?

A1: We are factory and can do the exporting work by ourselves.

Q2: How long is your delivery time?

A2: About 50 workdays after received the deposit.

Q3: What is your terms of payment ?

A3: T/T and Irrevcoable L/C. 30% T/T in advance, 70% balance before shippment.

Q4: Can engineers service overseas?

A4: Yes, totally no problem.

Q5: What about the guarantee period?

A5:You will have 12 months guarantee time for the powder coating booth, if the parts broken as our mistake, we will send you by DHL.


But as we do the pre install before the laoding, so this situation won't very easy to happen we believe.


After one year, if you still have any help about the equipment, please feel free to contact us at any time, as we will supply you lifelong service.

China Fully Automatic Powder Coating Paint Plant 380V 220V Metal Powder Coating Line supplier

Fully Automatic Powder Coating Paint Plant 380V 220V Metal Powder Coating Line

Inquiry Cart 0