

Add to Cart
Automatic 1000mm Adhesive BOPP Coating Machine
* Equip with high precision automatic rectifying device to make the
collection even.
* Automatic gluing system equips with high precision gluing roll
and control block will make the glue apply evenly, and 11save glue
*Anti-explosion and high temperature resistance thermal cycling
system, make the same temperature in each position.
* Equips with 4 rolls for final product collection, up and down
roll will dislocate to collect the rolls, which improves the 11work
efficiency.
* Equips with high precision and wearproof pneumatic shaft for
collection roll, it will very easy to control the frictional
1FForce between collection roll and type core.
* Equips with knurling roll, which will keep a good viscidity for
the type.
* All the doctor roll, gluing roll, film delivery roll are all
pneumatic controlled.
* The oven door is on the flank, which is convenient for the oven
maintenance
* Equips with automatic tube cutting machine and tube load and
unload machine.
* Double adhesive type making is option.
* Printing is an option for the machine
Technical Parameters:
Model | UW500 | UW1000 | UW1300 | UW1600 |
Effective width | 600millimeter | 1100millimeter | 1400millimeter | 1700millimeter |
Mechanical speed | 5-180m/minute | 5-200m/minute | 50-300m/minute | 50-300m/minute |
Glue uniformity | ±0.001 millimeter | |||
Rolling flatness | ±1 millimeter | |||
Heating method | Hot stove/Electricity/Heat transfer oil/Steam | |||
Oven length | Can be customized according to needs | |||
Power supply | 380V 50HZ | |||
Gas source | 5-7kgcm2 |
Application:
This coating machine is suitable for the BOPP sealing tape.
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.