

Add to Cart
Modern Design Fast Build Steel Structure Metal Frame Warehouse
Workshop Low Price
Modern steel workshops utilize high-strength structural steel (SSS) grades like ASTM A572 (Yield Strength: 345-450 MPa) combined with advanced connection systems. Key benefits include:
Table 1: Material Comparison
Property | Structural Steel | Reinforced Concrete | Prefab Aluminum |
---|---|---|---|
Density (kg/m³) | 7,850 | 2,400 | 2,700 |
Tensile Strength (MPa) | 400-550 | 3-5 | 90-250 |
Thermal Conductivity | 50 W/m·K | 1.7 W/m·K | 237 W/m·K |
Recyclability | 98% | 30% | 95% |
Modern workshops follow EN 1993-1-1 standards with BIM integration. Critical factors include:
Table 2: Production Stages
Stage | Duration | Key Equipment | Tolerance Control |
---|---|---|---|
Cutting | 15-30 hrs | CNC Plasma (40,000A) | ±0.5mm |
Forming | 20-40 hrs | Hydraulic Press (5000t) | ±1.2mm |
Welding | 50-80 hrs | SAW (1000A) + Robotic MIG | AWS D1.1 Class A |
Surface Tx | 10-15 hrs | Grit Blasting (SA 2.5) | 60-80μm profile |
Three-coat systems per ISO 12944-C5:
Corrosion rate: <1.5μm/year in marine environments
Steel structure warehouse composition | |
1. column and beam | Material Q355 box or H-shaped steel (painted or galvanized) |
2. Steel structure spraying | galvanized or painted |
3. wall&roof purlin | C or Z section steel |
4. wall&roof panel | colorful corrugated steel sheet ,sandwich panels with EPS, rock wool, fiber glass, PU etc. |
5.support | steel angle, steel pipe, steel round |
6.gutter | steel sheet or galvanized steel sheet |
7.downpipe | pvc pipe |
8.door | sliding sandwich panel door or rolling metal door |
9.window | PVC or aluminum alloy windows |
10.accessory | anchor bolt,high strengthen bolt, normal Bolt, skylight Belts, ventilators, etc |
11.Use | Our steel structure building have many applications and uses. Workshop, warehouse, office building, multi-story building, hangar,garage, livestock farm,poultry farm ,ect. |
12.Advantage | 1.Low cost, convenient. |
2.Easy assembly and disassembly many times without damage. | |
3.Widely used in construction site, office building , etc. | |
4.Good environmental protection. |
Causes:
Solutions:
Common Problems:
Preventive Measures:
Issues:
Mitigation:
Risk Factors:
Remedies:
Sources:
Control Methods:
Issue Category | Typical Defects | Recommended Solutions | Standards Referenced |
---|---|---|---|
Corrosion | Rust, pitting, coating flaking | 3-coat painting, galvanizing, drainage design | ISO 12944, ASTM A123 |
Welding | Cracks, porosity, distortion | Preheating, NDT, overcapacity design | AWS D1.1, EN 1090-2 |
Thermal Movement | Panel gaps, beam deflection | Slotted bolts, expansion joints | ASCE 7, AISC 360 |
Foundation | Cracks, uneven settling | Pile foundations, soil stabilization | IBC 2021, ACI 318 |
Noise/Vibration | Worker discomfort, equipment wear | Isolators, acoustic dampening | OSHA 1910.95, ISO 3746 |