Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low Price

Brand Name:YDX
Certification:CE ISO SGS
Model Number:YDX-A6
Minimum Order Quantity:1-10000 square meters
Delivery Time:20-30 works days
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: 1202, Block A, Yulong Building, Laoshan District, Qingdao, Shandong, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low Price

Steel Structure Metal Workshop: A Comprehensive Analysis

1. Structural Characteristics & Advantages

Modern steel workshops utilize high-strength structural steel (SSS) grades like ASTM A572 (Yield Strength: 345-450 MPa) combined with advanced connection systems. Key benefits include:

  • Span Capacity: Clear spans up to 120m using space frame systems
  • Construction Speed: 40% faster than concrete structures
  • Seismic Performance: Energy dissipation capacity of 25-35% through ductile connections
  • Life Cycle Cost: 30-50% lower maintenance cost over 50-year lifespan

Table 1: Material Comparison

PropertyStructural SteelReinforced ConcretePrefab Aluminum
Density (kg/m³)7,8502,4002,700
Tensile Strength (MPa)400-5503-590-250
Thermal Conductivity50 W/m·K1.7 W/m·K237 W/m·K
Recyclability98%30%95%

2. Design & Engineering Considerations

Modern workshops follow EN 1993-1-1 standards with BIM integration. Critical factors include:

2.1 Load Calculations

  • Live loads: 0.75-1.5 kN/m² (industrial use)
  • Wind loads: 0.6-2.1 kN/m² (zone-specific)
  • Crane loads: Up to 1000t capacity in heavy industries

2.2 Connection Systems

  • Moment-resistant joints: Extended end-plate (EEP) connections
  • Slip-critical bolting: ASTM F3125 Grade A325 bolts
  • Semi-rigid connections: 15-25% rotational stiffness

3. Manufacturing Process Flow

Table 2: Production Stages

StageDurationKey EquipmentTolerance Control
Cutting15-30 hrsCNC Plasma (40,000A)±0.5mm
Forming20-40 hrsHydraulic Press (5000t)±1.2mm
Welding50-80 hrsSAW (1000A) + Robotic MIGAWS D1.1 Class A
Surface Tx10-15 hrsGrit Blasting (SA 2.5)60-80μm profile

4. Advanced Technologies

  • Digital Twin Integration: Real-time stress monitoring with IoT sensors (5G enabled)
  • Automated Erection: AI-guided cranes achieving 0.5cm positioning accuracy
  • Sustainable Solutions: Photovoltaic steel roofs (BIPV) with 25% energy generation

5. Maintenance & Corrosion Protection

Three-coat systems per ISO 12944-C5:

  1. Zinc-rich primer (75μm)
  2. Epoxy intermediate (150μm)
  3. Polyurethane topcoat (50μm)

Corrosion rate: <1.5μm/year in marine environments

Steel structure warehouse composition
1. column and beamMaterial Q355 box or H-shaped steel (painted or galvanized)
2. Steel structure sprayinggalvanized or painted
3. wall&roof purlinC or Z section steel
4. wall&roof panelcolorful corrugated steel sheet ,sandwich panels with EPS, rock wool, fiber glass, PU etc.
5.supportsteel angle, steel pipe, steel round
6.guttersteel sheet or galvanized steel sheet
7.downpipepvc pipe
8.doorsliding sandwich panel door or rolling metal door
9.windowPVC or aluminum alloy windows
10.accessoryanchor bolt,high strengthen bolt, normal Bolt, skylight Belts, ventilators, etc
11.UseOur steel structure building have many applications and uses. Workshop, warehouse, office building, multi-story building, hangar,garage, livestock farm,poultry farm ,ect.
12.Advantage1.Low cost, convenient.
2.Easy assembly and disassembly many times without damage.
3.Widely used in construction site, office building , etc.
4.Good environmental protection.

Common Issues in Steel Structure Metal Workshops: Analysis & Solutions

1. Corrosion and Degradation

Causes:

  • Exposure to moisture, chemicals, or salt-laden air in coastal/industrial areas
  • Insufficient protective coatings (e.g., <3 layers of paint)
  • Poor drainage systems leading to water pooling

Solutions:

  • Apply 3-coat systems per ISO 12944-C5 standards (zinc-rich primer + epoxy + polyurethane)
  • Use hot-dip galvanizing (85μm minimum thickness) for critical components
  • Install sloped roofs (≥5° pitch) and gutter systems to prevent water retention

2. Welding Defects and Joint Failures

Common Problems:

  • Porosity, cracks, or incomplete penetration in welds
  • Fatigue failure at high-stress connections (e.g., crane rails)
  • Thermal distortion from uneven heating during welding

Preventive Measures:

  • Follow AWS D1.1 standards for weld quality and NDT (X-ray/ultrasonic testing)
  • Use preheating (150–260°C) for thick sections to reduce residual stresses
  • Design moment-resisting connections with 20–30% overcapacity

3. Thermal Expansion Challenges

Issues:

  • Misalignment of roof/wall panels due to temperature fluctuations (ΔT ≥40°C)
  • Buckling of long-span beams (>30m)

Mitigation:

  • Install slotted bolt holes to allow 10–15mm movement
  • Use expansion joints every 60–90m in building length
  • Select materials with low thermal conductivity (e.g., insulated panels with λ ≤0.05 W/m·K)

4. Foundation Settlement

Risk Factors:

  • Inadequate soil compaction (bearing capacity <150 kN/m²)
  • Differential settlement from uneven loads (e.g., heavy machinery)

Remedies:

  • Conduct geotechnical surveys to determine soil type (e.g., clay, sand)
  • Design pile foundations (15–30m depth) for soft soils
  • Install grout-filled leveling plates under column bases

5. Vibration and Noise

Sources:

  • Machinery operation (e.g., CNC machines: 70–90 dB)
  • Resonance in lightweight roof decks

Control Methods:

  • Use vibration isolators (natural frequency ≤5 Hz) under equipment
  • Install acoustic panels (NRC ≥0.75) on ceilings/walls
  • Add mass to roof systems (e.g., 100mm concrete topping)

Comparative Table: Key Issues vs. Solutions

Issue CategoryTypical DefectsRecommended SolutionsStandards Referenced
CorrosionRust, pitting, coating flaking3-coat painting, galvanizing, drainage designISO 12944, ASTM A123
WeldingCracks, porosity, distortionPreheating, NDT, overcapacity designAWS D1.1, EN 1090-2
Thermal MovementPanel gaps, beam deflectionSlotted bolts, expansion jointsASCE 7, AISC 360
FoundationCracks, uneven settlingPile foundations, soil stabilizationIBC 2021, ACI 318
Noise/VibrationWorker discomfort, equipment wearIsolators, acoustic dampeningOSHA 1910.95, ISO 3746

Proactive Maintenance Strategies

  1. Bi-annual inspections: Check coatings, bolts, and drainage (post-monsoon/winter).
  2. Real-time monitoring: Install IoT sensors to track strain (±0.01% accuracy) and humidity.
  3. Training programs: Certify welders to ISO 9606-1 and crane operators to OSHA 1926.1400.


China Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low Price supplier

Modern Design Fast Build Steel Structure Metal Frame Warehouse Workshop Low Price

Inquiry Cart 0