Stainless Steel Machined CNC Precision Stainless Steel Roller

Brand Name:PFT
Certification:ISO9001:2015, ISO13485:2016
Model Number:OEM
Minimum Order Quantity:1PC
Delivery Time:7-15 work days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: Building 49, Fumin Industrial Park, Pinghu village, Pinghu town, Longgang District, Shenzhen City, Guangdong Province, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Stainless Steel, Machined CNC Precision Stainless Steel Roller

Quick details:

1. Keyword: CNC Stainless Steel Parts

2. Process: CNC Machining

3. Color: As per your requirement

4. Place of Origin: Guangdong, China

5. Application: Widely used

6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)

7. Equipment: CNC Machining Centers

8. Lead time: 1-2 weeks


Description:

Shenzhen perfect precision products Co., Ltd. was established in 2012. At present, it has 3000-5000 square meters of large-scale facilities in Shenzhen. We have advanced technology and strong financial strength, specializing in sheet metal processing, stamping, CNC processing, CNC stamping, mold design and production, and injection molding.

We believe that our team will be your right-hand man and provide you with high-quality service. We mainly accept OEM/ODM business because we only provide consulting teams, experienced workers, supply chain management, various solutions, and exports.


Specification:

MaterialStainless Steel
ApplicationWidely used
ColorSilvery
PackageCarton Box
Surface treatmentBushing/ Laser engraving/ Etching/ Polishing/ Silkscreen/ Sandblasting etc.
Drawing format2D/(PDF/CAD),3D(IGES/STEP)
CertificatesISO9001:2015/ISO13485:2016
Lead time1-2 weeks

FAQ

1. Where is your factory?

We are located in Shenzhen, China.

2. What do you need to provide a quote?

Please kindly send us the drawings or samples of your product. Details below should be included: Drawings/Quantity/Material/Other Requirements

3. How about the packing?

Standard or customized will both be available.

4. Will my drawings be divulged if you benefit?
No, we pay much attention to protecting our customers’ privacy of drawings, and signing NDA are also accepted if needed.

5. What about the leading time for mass production?

Frankly, it depends on the order quantity, and it is common about 7 days to 15 days after your deposit if no tooling is needed.

China Stainless Steel Machined CNC Precision Stainless Steel Roller supplier

Stainless Steel Machined CNC Precision Stainless Steel Roller

Inquiry Cart 0