2024 High Capacity Cutter Suction julong dredger for Inland River Dredging and Cleaning

Brand Name:JULONG
Certification:ISO/CE/BV/RINA
Model Number:JLCSD250
Delivery Time:30-90 Days
Payment Terms:T/T , L/C etc.
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Xuzhou Shandong China
Address: No.678, Xuzhou Road, Shaozhuang Town, Qingzhou City, Shandong province, China
Supplier`s last login times: within 38 hours
Product Details Company Profile
Product Details

2024 High Capacity Cutter Suction Dredger for Inland River Dredging and Cleaning


- Company Profile


A.38 Years Experience
Julong has been in dredgers manufacturing field for 38 years,and has the strong research and development ability.
B.Quality Guarantee
Julong builds cooperation with china best ship design institutes;and Julong products will be fully tested before delivery.
C.Production Guarantee
Julong production capacity is strong,the production cycle is short,the delivery time is guaranteed.
D.After-Sales Service
Julong has built after-sales service team in the main sales areas,which could be ready to supply best after-sales service for all customers.


  • Technical Specifications

ModelDredging DepthDredging CapacitySuction/Discharge Pipe Dia.Engine(s) Power
JLCSD2001-5 m500 m3/hr200/200 mm160-300 KW
JLCSD2501-8 m800 m3/hr250/250 mm200-400 KW
JLCSD3001-12 m1400 m3/hr300/300 mm400-600 KW
JLCSD4001.5-14 m2500 m3/hr400/400 mm700-1200 KW
JLCSD5001.5-15 m3500 m3/hr600/500 mm1100-1600 KW
JLCSD6501.5-18 m5000 m3/hr650/650 mm2200-2500 KW
JLCSD7001.5-20 m7000 m3/hr750/700 mm2800-3500 KW

- The above parameters are for reference only. We can customize them according to your needs.


  • In Work Site

  • Feature & Advantage

a.38 years experience in dredger manufacturing

b.ISO,CCS,BV,CE,EAC certification

c.Support factory visits and inspections

d.Perfect management system and mature company team

e.Core technical staff and R&D team

f.Reliable productivity, strict control of product quality

g.Modular structure, easy to disassemble and transport

h.Our equipment:

1. One man operation.The most advanced Siemens PLC control system.
2. New highly effective cutter driven system
3. Reliable hydraulic system.
4. Fresh water cooling system.
5. Completely assembled and fully tested before delivery.
6. Very simple and fast assembly with experienced engineers.
7. Standard design, allowing short delivery times.
8. Standard spare parts available from stock.
9. Designed as standard to qualify for Coastal Waters Certificate


  • Details

  • Certificates

  • Customer Visit


China 2024 High Capacity Cutter Suction julong dredger for Inland River Dredging and Cleaning supplier

2024 High Capacity Cutter Suction julong dredger for Inland River Dredging and Cleaning

Inquiry Cart 0