Customized Prefab Modular House 20FT Apple Cabins Heat Resistant

Brand Name:Huohu
Certification:CE
Model Number:20ft
Minimum Order Quantity:1/set
Delivery Time:15-20 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou China
Address: Room 1608, Building 8, Tongxin No. 1 Manufacturing, Shiji Town, Panyu District, Guangzhou,China
Supplier`s last login times: within 25 hours
Product Details Company Profile
Product Details


StructureGalvanized Steel Frame
Exterior WallMetal Carved Panel
Interior WallBamboo Wood Fiber Board
CeilingIntegrated Ceiling
FloorComposite Wood Floor
InsulationRock Wool
ColorCustomized
BathroomDry-wet Separation
ElectricityLighting + Socket + Switch

FAQ:


1.How much manpower and time does it take to install the container?
4 hours + 4 workers=1 unit
2.What tools and equipment do I need to prepare for the installation of container?
Crane, cutting machine, hand drill, hexagonal screwdriver, utility knife, non-slip gloves, rivet gun, glass glue gun, tape measure, medical box, marker pen, foot ladder, level meter.
3.How many days is your fastest lead time?
This depends on the quantity. If it is a regular size, our lead time is generally 7-15 days after receiving the deposit
4.Can you customize colors?
We are happy to accept color customization. The regular color of our boxes is white and grey.
5.which is popular and well received by customers all over the world?
You can also provide the color card number for our reference. What color do you like?
6.What is the largest size that can be made?
The maximum can be 3500mm *8000mm, and the 8m surface is equipped with wind-resistant columns to support the top and bottom beams. What kind of functions and requirements are you based on?
7.What is your payment method?
Our payment method is generally TT (wire transfer), 30% deposit, and the remaining 70% paid before shipment.
8.Does your product leak water?
There are quite a number of domestic manufacturers, due to lack of professionalism and irresponsibility for quality, which leads to the problem of water leakage in the box. So far, our company has never experienced water leakage problems in overseas orders.
9.Do you need a foundation?
If the land will not subside, there is basically no need to lay foundations. According to different geological conditions, our company will provide guidance and suggestions. If you buy container from us, we will give you complete foundation drawings .We will have video instructions for installation or on-site guidance.
10.Can I add an extra roof please?
Roofs can be added, and we can send you some pictures of roofing cases we have done before for your selection and reference. Do you want to add a roof based on wind resistance requirements, thermal insulation requirements or aesthetic requirements?
11.How are your container house insulated?
Wall panels are made of 50mm rock wool sandwich panels, and can be upgraded to 75mm and 100mm thickness, which i s better for extreme cold and hot weather.
12.Can the floor be covered with insulation?
Yes.

China Customized Prefab Modular House 20FT Apple Cabins Heat Resistant supplier

Customized Prefab Modular House 20FT Apple Cabins Heat Resistant

Inquiry Cart 0