1000m/min Second Hand 90 Tube Converter Winding Machine

Certification:CE ISO
Minimum Order Quantity:1 set
Delivery Time:15 days
Payment Terms:L/C, T/T
Place of Origin:China
Price:negotiate
Contact Now

Add to Cart

Verified Supplier
Location: Changzhou Jiangsu China
Address: 16A-103, Jintong International Industrial Park, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

Second-Hand 90 Tube Energy-Effcient Converter Winding Machine


Descripition:
Changzhou United Win Pack Co., Ltd. specializes in various specifications of circular loom equipment, wire drawing units, adhesive tape equipment, such as: 6/8/10 shuttle circular loom, winding machine, monofilament/ multifilament extrusion line, flat yarn extrusion production line, FIBC bag machine, tarpaulin making machine, artificial turf production line, yarn twisting machine, tape coating/ slitting/ rewinding machine, etc.
We also provide the related tape equipment, circular loom, winding machine accessories, such as: shuttle unit, shuttle body, shuttle wheel, roller, push wheel, shaft, eccentric wheel
, spring, axle, sleeve, clamp, bolt, blade, ect.
Our company's sophisticated production equipment, advanced manufacturing technology, testing means complete. If you have any need for related equipment or parts, you can contact us and we will quote you as soon as possible.

Technical Parameters:

NameHigh Speed Winding Machine
ApplicationSuitable for Yarn Stretching Extrusion Machine
MaterialPlastic, Metal
Delivery SpeedFast
QualityHigh Quality Guarantee
CategoryYarn Winding Machine
ConditonNew


Parts Photos:


FAQ:
1. Are you trading company or manufacturer?
We are manufacturer, and also provide the business solution to all the friends.

2. What's payment terms you accept?
The buyer make the 30% deposite,the 70% balance will be paid by TT within 7 days before delivery or the buyer open 100% irrevocable L/C at sight as the appointed bank of the seller.

3. What's the delivery time?
The seller will arrange shipment within 90working days once confirm the order.

4. How to install and debug the machine after arrival?
We will provide instructions and installation videos. If the Buyer needs engineers to install in the local area, the buyer should pay USD150 per day for subsidy of engineers and afford the charge of daliy life(including the daliy meal ,traffic and hotel) in the locus of buyer and return tickets from China to User's factory.

5. Does it easy to operate and what can i do if it doesn't work?
First ,our machine is stable and easy to operate by one man ,what you do is just learn some basic thing. And we will sent you manual and video ,we suggest you to come to visit our factory to learn more thing by yourself , and if there is something goes wrong , you can call us ,video-chat ,email us . And we will give solutions within 36 hrs .Our engineer also can be distributed to overseas as you required.

6. How long is your machine's warranty period?
Seller warrants the products for 13 months from the B/L date.

China 1000m/min Second Hand 90 Tube Converter Winding Machine supplier

1000m/min Second Hand 90 Tube Converter Winding Machine

Inquiry Cart 0