

Add to Cart
Used Circular Loom Machine For Woven Bags Universal Intelligent
Descripition:
Mesh bag circular loom is mainly used to produce cylindrical mesh
bags for packaging vegetables, fruits and other agricultural
products. The suitable raw material is PE or PP. 100% recycled
materials can be used also. Usually weft yarn is flat yarn(tape)
and warp yarn can be monofilament or flat yarn.
Advantages:
1. The structure design of the whole machine is novel and
reasonable, the maintenance is convenient.
2. High speed, low noise , low friction, energy saving , high
efficiency.
3. Adopting the interweaving technology, the weft is not easy to
loosen, and it is not easy to stretch after filling with fruits and
vegetables.
4. The loom is controlled by Inverter, and it will automatically
stop if the weft are finished or the warp, weft yarn is cut off,
machine also equip with a meter counter.
5. Intelligent system is used for lifting and winding of fabric,
automatic tracking and synchronization.
Main technical Datas:
Working width,double flat | 60-750mm |
Number of shuttles per machine | 4 |
weft density | 10-24pcs/10cm |
Speed | 0-120RPM |
Warp feeding | Motor |
Inner diameter of Bobbin | 38mm |
Bobbin length | 230mm |
Max. bobbin diameter | 100mm |
Number of Warp yarns | 512pcs |
Normal rating of main motor | 2.2kw |
lift motor power : | 22N |
winding motor power: | 10kgs Torque motor |
Total power | 3Kw |
Installed size (mm) | 10500* 2400* 3200 |
weight | 2T |
Machine Photos:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your
factory, non-woven material, power source, air compressor etc.
Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets,
hotel, food, and also their salary 80USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have
more than five years machine installation experience.
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty
date.