

Add to Cart
China factory hydraulic butt welding machine SHT160-SHY for
Building Material Shops
90 355 hdpe pe pipe jointing welding equipment hot joint machine
When our hydraulic butt fusion welding machine together with data
logger, the welding process is in a semi-automatic way, continuous
repeat of the welding cycles and automatic control of preset
parameters.
Butt Fushion Welding Machine Technical data:
Size | SHT160 -SHY | |
SHT160 -SHY | Working Range | 63-160mm |
Caliber (mm) | 63, 75, 90, 110, 125, 140, 160 | |
Heating board max temp. | 270 °C | |
Temperature bias | “+/-5° | |
Pressure adjustment range | 0-10Mpa | |
Heating plate power | 1.5 Kw | |
Power of Heating plate: | 1.1 Kw | |
Hydraulic unit power | 0.75 Kw | |
Total power | 3.35 Kw | |
G.W./N.W.: | 117 Kgs | |
Packing size: | 92*52*47cm | |
70*53*50cm | ||
Preparation for welding HDPE Pipe manual Butt Fusion Welding Machine
1. Before operation, all equipment parts shall be placed on a
stable and dry place.
2. Confirm that the power supply used meets the requirements of the
equipment, the equipment is in good condition, and the electrical
circuit is not damaged; the detection indicator works normally, the
milling cutter blade is sharp, and the parts and operating tools
are complete.
Welding procedure for HDPE PIPE manual Butt Fusion Welding Machine
1. Check whether the specification and pressure grade of the pipe
to be welded are correct, and check whether there are bumps, bumps
and scratches on the surface. If the depth of the scar exceeds 10%
of the wall thickness of the pipe, it should be partially removed
before use;
2. Clean the oil or foreign matters at both ends of the pipe with a
clean cloth;
3. Place the pipe to be welded in the frame slip, so that the
length of both ends is equal (as short as possible without
affecting the milling and heating). The part outside the frame of
the pipe shall be supported by supports to reduce friction, and
then be fastened with slips;
5. Close the two pipe ends and check the alignment of both ends.
The misalignment at both ends of the pipe should not exceed 10% of
the wall thickness, which can be improved by adjusting the
straightness and the elastic slip of the pipe; the gap between the
two ends of the pipe should not exceed 10% of the wall thickness,
otherwise it should be milled again until the above requirements
are met;
6. Clean the dust and residue on the surface of the heating plate
(pay special attention not to scratch the nonstick layer on the
surface of the heating plate);
7. After the temperature of the heating plate reaches the set
value, put it into the rack and apply the specified pressure until
the minimum crimping on both sides reaches the specified value;
8. Reduce the pressure to the contact pressure and continue heating
for the specified time;
Our service:
1) We offer 1 year warranty and free spare parts. (Except for
wearing parts)
2) We offer voltage and frequency of motor customization service,
such as 110v 60hz.
3) We can put your LOGO on machine plate or packing (need your
authorization on brand)
4) Machine can be shipped to overseas or domestic place by sea or
air in LCL or FCL.