Add to Cart
Gongyi UT Machinery
WhatsApp/Viber/Phone: 0086-18236968979
Skype: orion.chai
PVC insulated wire cable extruding machines cable insulation extruding extruder machines
The ut-70 type wire cable makingline is suitable for 1.5mm, 2.5mm and so on. You only need tell me the finish products specification, we could supply custom mold.
Pre-sale:
1. Suggest to client suitable Bare wire diameter, final product capacity.
2. Introduce machine's structure and features in detail, explain the price component.
3. Answer client concerned questions.
After-sale:
1. Start production as soon as receiving down payment.
2. Send photos of machine in manufacturing and finished photos to client, for your better learn about the machine's condition.
3. Delivery machine in time, taking photos during loading, so you can "remote monitoring" your goods.
4. Documents and certificate available in time.
5. Manual documents available. Engineer can be sent to client site for installation instruction.
Technical parameters:
UNIT | UT-70 | |
diameter of wire core | mm | 1.5-20 |
Coil in speed | m/min | 2~60 |
screw diameter | mm | 70 |
L/D ratio | 25:1 | |
compression ratio | 1:3 | |
host power | kw | 30 |
heating power | kw | 15-25 |
hauling power | kw | 7.5 |
hauling speed | m/min | 10-40 |
caterpillar traction(max) | t | 1600 |
cooling groove length | m | 8 |
take up bobbin diameter | mm | Φ1000 |
torsion of take up motor | N·m | 40 |
INSTALLMENT AND DEBUGGING:
machine is to be fixed and fastened according to requirement and
check the below, then test run.
1. Check whether or not all bolts, screws and anchor bolts are
completely tightened.
2. Check reducer gear box and then fill enough oil into it after
making sure there is no dirt inside.
3. Check whether or not the connection of temperature cabinet and
electrical lines is correct.
4. check where or not the direction of motor rotation is right.
5. Check whether or not hauling machine's air source has reached
working pressure
6. Check the rotating components are flexible.
These checks are completed, starting motor with empty machine
operations, if have not find other faults, according to the
following items for actual trial.
1. According to the requirements for the installation of mould and
mould teat.
2. According to requirement to adjust every district temperature of
host machine.
3. pour cooling water into groove.
4. install conductor on pay off frame.
5. lead wire core go through mould teat in level.
6. Use preset lead strings to lead wire core into take up bobbin
through hauling machine.
7. start machines and test run
8. check the wire being produced whether in line with the
requirement, if nothing wrong, keep going normally.
MAINTENANCE:
Proper use and maintenance is to guarantee that the machine can
work properly and prolong its service life, maintenance system must
be strengthen, first regularly check tightness degree of each part
of the retaining bolt, carries on the fastening, prevent loosening.
Everywhere bearing greases should maintain moderate (occupy space
2/3), insufficient shall promptly add, prevent lack of oil or dry
friction burning out bearings, and grease should guarantee the
bearing clearance are not damaged, to ensure that the service life
of the bearings.