

Add to Cart
Intermediate copper wire drawing machine with annealing 20 meter per minute drawing breakdown machinesecond Hand The Low Carbon Steel Wire Drawing Machine
Contact: Orion
Mobile/whatsapp/wechat: 0086-18236968979
Skype: orion.chai
Copper Wire Drawing Machine is used for drawing copper wire from 3.0 mm to 1.13-2.78 mm. Outlet wire can be collected by single spool take up.
(1) Max.Dies Quantity: 10 die
(2) Outlet wire size: 1.1mm--3 mm
(3) Max speed: 20 m/s
(4) Three or four sections horizontal annealing is optional choice.
Advantage:
(1). For same finished size, compare to Rod Breakdown Machine,
electricity and energy saving.
(2). Ironed cast and Wear-resistant capstan can keep long life.
(3). Fully immersed lubrication, lubrication tank body is separated
with gear box without oil mixed.
(4). Besides normal copper, also is a good choice for welding wire
(5).Horizontal annealing design is easily for operating.
(6). Longer annealing section with tension ensure good and stable
elongation.
Gongyi UT Machinery co.,ltd is located in Gongyi city, Henan province, a high-tech manufacturer specializing in research and development of equipment. As a professional manufacturer, we have a highly qualified and skilled engineer team, and advanced assembly workshop. Our products sell well at home and abroad, and enjoy good reputation.
We provide high-quality products and professional technical support.We aim at the management of market-oriented and customer-satisfied, we have a plot of improvement, constant upgrading product quality and service.
Our company has always adhered to the tenet of "honesty for basis, quality for living, innovation as the theme, and development as the focus", abide by the quality commitment to users, and won the trust of customers.
1.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical
support
2.PAYMENT TERMS:
50% of total amount should be paid by T/T as down payment ,the
balance (50% of total amount) should be paid before delivery by T/T
or irrevocable L/C by payment(at sight).
3.DELIVERY CONDITIONS:
3.1 Delivery condition: FOB Qingdao/ Shanghai port or CIF destination Port.
3.2 Delivery terms: Within 10-14 working days after receipt of
advanced payment, the seller should inform the buyer to do
inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full
payment.
4.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt
in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge
service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for
the sold goods, the buyer pay for needed spare parts after the
12months warranty terms.
5.INSPECTION
When the machine finished, the seller should inform the buyer to do
inspection before shipment, the seller guaranty good performance of
all the sold goods.the seller undertake the material cost for the
machine inspection in seller's factory. the buyer should come to
seller's factory to do the inspection work, or the buyer could
entrust any third party to come to seller's factory to do the
inspection work.
6.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to
buyer's factory for installation and testing the whole line, and
the buyer should undertake the whole food/place and round tickets
(airplane, food, hotel, and so on), and pay salary to engineer for
100 usd/day/engineer.
Our Services:
1. We could send engineers to the buyer's factory for installation
instruction, commissioning and training service at buyer's cost.
2. Our machine has 12 month guarantee since the installation in
buyer's factory. During the guarantee time, if any parts (except
the easy damaging parts) are damaged under normal operation, we
will offer free spare parts. After the guarantee time, we will
offer the spare parts with cost price.
3. If the buyer have any problem during the operation, we will
offer technical solutions.