

Add to Cart
Mobile Vehicle Inspection Facility for both truck and cars - (Combination One)
The mobile vehicle safety testing center has all the functions of fixed test station: it can be used for axle load of 15 tons ,two axes with wheelbase of less than 6 meters (rear Mercedes buses),Three-axis(single bridge drive), two-axle trailer, semi-trailer truck to implement headlamps, exhaust, smoke, sound level, side slip, axle load, braking power, speedometer and other safety performance testing.
Mobile
Different mobile devices can be combined to form test lane with
different functionsNo need foundation. easy to move
Easy maintenance, simple connection
Carriage
With high-power silent generator, movement is not limited by power
supply
Operating room with air conditioning, quiet and comfortable, not
effected by the weather
Ultra-thin base design, lower chassis vehicles can be inspected
Hydraulically flipped ramps without manual intervention
Synchronization lift and down, to prevent the carriage from
unbalancing
Can be customized according to customer needs
Model | Load | Test item/Features/Description | Qty | Configuration feature |
CTYJ-15 | 15T | 15T brake tester with axle load-Mobile one | 1 | Motor Power 11KW X 2 Testing Speed 2.0 Km/h Testing Range 0-80KN Roller Size D150mm x 1200mm Power Supply 380V 50Hz |
15T Side slip tester (single board)-Mobile one | 1 | Throw Speed 5Km/h-10Km/h Testing Plate Length 800mm | ||
15T Mobile speedometer tester-Mobile one | 1 | Roller size: 1.00-1200mm Testing speed 0-120Km/h | ||
15T play detector | 1 | Motor Power 2KW Power Supply 24V, 380V/220V Movement of Plate: ±80mm x ±50mm Hydraulic Pressure: 16Mpa | ||
headlight tester | 1 | Manual headlight tester: Testing range 0-25000cd | ||
Opacimeter | 1 | Opacimeter for testing diesel vehicle | ||
gas analyzer | 1 | For testing the car | ||
trolley | 1 | For gas and smoke | ||
Control system | 1 | Including cabinet, software, industrial computer, monitor, and
tablet computer with printer and LED guide as well as voice broadcasting system | ||
Carriage | 1 | Including: container box, hydraulic system, generator, lifting system |
1. After the product is used for three months, please disassemble
the platform panel and add calcium-base lubrication grease to the
guide seat with a pressure rod type oil gun to lubricate the guide
sleeve and guide pillar. And also check if the fastening bolts of
guide seat and oil cylinder etc. components are loose.
2. Please check the oil level in the oil tank of hydraulic station.
Add N46 engine oil (old standard is 30# engine oil) if the oil
volume is insufficient.
3. In case the oil pipe of hydraulic system is broken and the oil
sprays outside, please stop the operation immediately and carry out
maintenance. Do not block the broken place with hands. Otherwise
the high pressure oil may injure persons.
Q1. What is your terms of packing?
A: Generally, we pack our goods in wooden case per set
Q2. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the
photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB
Q4. How about your delivery time?
A: Generally, it will take 10 or 30 days after receiving your
advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We
can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but
the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our
customers benefit ;
2. We respect every customer as our friend and we sincerely do
business and make friends with them,
no matter where they come from.