Product Details
3000-36000bph automatic filling machine
Scope of application
Automatic bottled water filling machine is widely used in the
production of bottled water such as mineral water and pure water.
At the same time, it can also be used for fruit juice, fruit wine,
beverages and other non-gas-containing liquid filling production.
Parameter Table
model | DCGF14-12-6 | DCGF18-18-6 | DCGF24-24-6 | DCGF32-32-10 | DCGF40-40-12 | DCGF50-50-15 | DCGF60-60-15 |
Yield (bottle / hour) | 2000-3000 | 3000-5000 | 5000-7000 | 7000-10000 | 10000-15000 | 16000-20000 | 20000-24000 |
Filling accuracy | + 5 mm (liquid level) |
Fill pressure (Mpa) | ≤0.4 |
PET and bottle size (mm) | (Bottle diameter): φ 50- φ 115; (height): 160-320 |
Suitable lid shape | Plastic cover or crown cover |
Total power (Kw) | 4 | 5.2 | 6.2 | 6.2 | 7.5 | 11 | 15 |
weight (Kg) | 2500 | 3500 | 4500 | 6000 | 7200 | 10000 | 11500 |
Overall dimensions (mm) | 2250×1650×2250 | 2600×1965×2250 | 2980×2200×2250 | 3880×2200×2250 | 4000×2250×2500 | 5500×3500×2500 | 6500×5500×2550 |
Packaging and transportation
FAQ
Q1: which city are you in? how can I get to your factory? Are you a
trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai.
We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10
years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our
factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water
machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the
machines and train your staff how to operate the machines If needed.Or you can arrange engineers to study in our factory. You
are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If
everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together
with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.
Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our
service also including machine maintence.
Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before
shipping. L/C is supported also.
Q8: How can I pay you?
After we confirmed order, I will send you sales contract with our
company bank information. You can transfer money to our company
bank account by T/T. Or you can pay via Western Union with credit
card, Smartcard or Visa Card.Or do L/C if it is accepted by both of
us .
If you still don't know how to pay, just call me at+86
18203685329(whatsapp no.)
Company Profile
Jingte’er.company is a professional enterprise involved in
manufacturing and marketing the best quality water treatment
equipment for a wide range and variety of customers home and
abroad. It is located in Zhengzhou, Henan province, China.
Now, over 90% of our workers and engineers have many years of
production experience, with production ability of 20 sets per day.
They could finish the procedure of design, casting, machining,
assembly and testing independently.The company is a high-tech
enterprise integrating scientific research, production, sale and
service of water treatment equipment.
Our team of specialists is committed to finding creative solutions
that meet the ever-changing demands of our valued customers.We are
convinced that our highly motivated staff with their totally
proficient craftsmanship will ensure the company moves steadily
forward.