

Add to Cart
XLPE IXPE Foam Machine Extrusion Making Machine For Crosslinked Polyethylene Foam
Foam sheet extrusion line is a single screw extrusion capacity,
which is suitable for the production of XPE foam sheet and IXPE
foam sheet.
Foam sheet extrusion line is composed of feeder,extruder,main
machine, mold, two-roll/three-roll calendering(or equipped with
cooling water tank),cooling roll,trimming machine,sheet traction
machine,single-station winder,etc.
IXPE (irradiation crosslinked polyethylene foam sheet) is produced with high temperature foaming after radiation cross-linking of the electron accelerator(no chemical bridging agent)on the extruded materials from filling mixing with polyethylene modified polyethylene, meeting RoHS
XPE(chemical crosslinked polyethylene foam sheet) is a polymer foam materials made by mixing polyethylene with various fillers and adding chemical crosslinker and foaming agent.
Specification:
Extruder | Unit | 170/30 |
Screw Diameter | mm | 170 |
L/D Screwt Ratio | 30:1 | |
Screw Speed | rpm | 1480 |
Motor Power | KW | 200 |
Mattrix Thickness Range | mm | 0.8-4 |
Capacity | KG | 80-260 |
Dimension | mm | 4600*2000*1600 |
Temperature measurement point | Zone | 16 |
Machine Details:
(1) Three Roll/Two Roll Extrusion Machine Sets:
Extruder Host → Three Roll Calender → Trimming Unit → Winding Unit
(2) Water Cooling Extrusion Machine Sets:
Extruder Host → Water Cooling Tank → Trimming Unit → Winding Unit
FAQ:
Q1:What plastic foaming machines could your company provide?
Internal mixer machine, Granulation machine, XPE foam extrusion
machine,
XLPE Horizontal foaming furnace, IXPE Vertical foaming furnace,
Embossing machine,
Foam laminating machine, Foam thicking machine, Glue coating
machine, PE slicing machine.
Q2:What kind of services can you provide?
We are specialized in manufacture the XPE/IXPE Foaming equipment,
in addition to installation and setup the production line, our
service also includes provide raw material formula, process
parameters and other technical services to the buyer freely.
Q3:How long is your lead time?
Normally it's about 10-25 weeks after order confirmed and deposit
received.
Q4:Is there any vulnerable parts? How to do if the vulnerable parts
damaged?
Yes, for the new XPE / IXPE enterprises, we provide operator
training services to help enterprises enter into the normal
production state in the shortest time.