

Add to Cart
3 Temperature Zones Horizontal Foaming Furnace Machine For XLPE Foam Production
XPE horizontal cross-linking foaming furnace includes the following
units:
Unwinder unit, Feeding unit, Horizontal foaming furnace unit,
Five-roller cooling unit, Double station winder unit.
The horizontal foaming furnace is 24400mm long, 3000mm wide and
4750mm high.
The foaming furnace has three sections, one for preheating, the
second for cross-linking and the third for foaming.
The insulation of the foaming furnace is based on galvanized steel
plate and rock wool (density 100 kg/m3). Insulation structure, an
independent steel structure support is added to the upper part of
the insulation body, which mainly bears the fan, burner, etc. on
the furnace body, reduces the noise of the fan operation, and is
equipped with an escalator for maintenance work.
Specification:
XPE Horizontal Foaming Furnace | Unit | XPE 24400-2000 |
Equipment Dimensions | mm | 24400*3000*4750 |
Equipment Output | kg/h | 60-200 |
Burner Heat Output | Kcal | 300,000 |
Temperature Zone | Zone | 3 |
Production Max Width | mm | 2000 |
Production Thickness Range | mm | 3-12 |
Preheating fan power | KW | 18.5 |
Crosslinking fan power | KW | 15 |
Foaming fan power | KW | 37 |
XPE horizontal cross-linking foaming furnace includes the following units:
Master Unwinding Machine Furnance Mouth Tractor Horizontal Furnance Unit
Cooling and Shaping Unit Double Station Winder
FAQ:
Q1:What plastic foaming machines could your company provide?
Internal mixer machine, Granulation machine, XPE foam extrusion
machine,
XLPE Horizontal foaming furnace, IXPE Vertical foaming furnace,
Embossing machine,
Foam laminating machine, Foam thicking machine, Glue coating
machine, PE slicing machine.
Q2:What kind of services can you provide?
We are specialized in manufacture the XPE/IXPE Foaming equipment,
in addition to installation and setup the production line, our
service also includes provide raw material formula, process
parameters and other technical services to the buyer freely.
Q3:How long is your lead time?
Normally it's about 10-25 weeks after order confirmed and deposit
received.