Absorption as 0.93-0.96 Am1.5 Tp Valve for Pressurized Systems Pressure Relief Valve

Certification:CE
Minimum Order Quantity:10
Delivery Time:Peak Season Lead Time: one month Off Season Lead Time: one month
Payment Terms:LC, T/T, D/P, PayPal, Western Union, Small-amount payment
Model NO.:WYA
Trademark:QIRUI/OEM
Contact Now

Add to Cart

Verified Supplier
Location: Jiaxing Zhejiang China
Address: No. 19, Chuangye Road, Huangwan Town, Haining City, Jiaxing, Zhejiang, China 314415
Supplier`s last login times: within 26 hours
Product Details Company Profile
Product Details
Solar Water Heater T/P Valve
1. Provide safe to us
2 Prolong the lifetime of the solar water hearer
Solar Water Heater T/P Valve
Temperature and pressure relief valve tp valve
Products Detail
T/P valve
1, CE certificate
2, Function: Relief pressure
3, Use: Pressurized water heater
4, Pressure range: 99degree/7bar

Designed and checked Based on American "ANSI Z21.22" Standard.
1.Using Method
Temperature and Pressure Relief Valves is suitable for Installing at the Pressurized solar water heater, gas heater, electric water heater , water heater of fuel, heat pump water heater , sensitive function heater, etc. various kinds of heaters( such as the boiler) and hot water containers . The valve will be opened at the set temperature and pressure to protect the water tank.
2.Technical Parameter
·Set Pressure(Psi): 75,87,100,125,150psi (0.5,0.6,0.7,0.8,1.0MPa)
·Set Pressure Tolerance: +5%,-10% of the set pressure.
·Set Temperature: From 65°C to99°C. (As you're required)
·Set Temperature Tolerance: 99°C-5°C; other set Temperature is ±5°C
·Dimensions/Weights
MODELSize
in
Inlet× Outlet
in
A
mm
B
mm
D
mm
T
mm
Weight
(g)
Temp. Steam
Rating BTU/hr
WYA-151/21/2×1/2418331100(205)15,000
WYA-203/43/4×3/4428331100(222)105,000
3.How to Installation
·Temperature and Pressure Relief Valves should be installed on the top of the water heater top or side. The Temperature sensing element must be immersed in the water within the top 6″of the tank.
·The eliminating pipeline should be installed under the relief valve. Its terminal station distance in floor drain should be greater than 6″to make it easily remove and observe water.
4.How to Safeguard And Maintenance:
·After installing water heater the users must lift the relief valve handle once at least every year, so as to ensure that unblocked things in the waterway of the relief valve.
·Before operating handles, please check the elimination pipeline which joining the relief valve, guaranteed that the hot water from the relief valve discharge the proper place, otherwise it may cause the bodily injury.
·If the handle is lifted, without water flowing out, it proves that the relief valve is invalid. Then it should turn off the water heater immediately and check the valve.


































China Absorption as 0.93-0.96 Am1.5 Tp Valve for Pressurized Systems Pressure Relief Valve supplier

Absorption as 0.93-0.96 Am1.5 Tp Valve for Pressurized Systems Pressure Relief Valve

Inquiry Cart 0