Grundfos Shaft SIC Mechanical Seal For Water Pump CH2-30/4-30 CH-12mm

Brand Name:YUE MI
Certification:ISO SGS
Model Number:CH-12mm
Minimum Order Quantity:5/PCS
Delivery Time:2 word days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou Guangdong China
Address: Huadu District, Guangzhou City, Guangdong Province, China
Supplier`s last login times: within 2 hours
Product Details Company Profile
Product Details

Grundfos Shaft SIC Mechanical Seal For Water Pump CH2-30/4-30 CH-12mm



Product Description

YM Seal Type CH-12 can be used in Grund fos® Pumps
JP, CH8, CH12, CRK12, CRK14, SPK1, SPK2, SPK4, SPK8, CR2,CR4 series pump, with shaft size 12mm

Products Features
Grund fos® Pumps Types
YM Seal Type CH-12 can be used in Grund fos® Pumps
For more information, please do not hesitate to contact our Technology department

Technical Parameters


Temperature-30℃~+200℃
pressure≤1.2Mp a
Speed≤12m/s

Materials


Rotary RingSIC CAR CE TC
Stationary Ring

SIC CAR CE TC

SpringSUS304/SUS316
Stationary SeatSUS304/SUS316
Secondary Seal

VITON/EPDM

Rotary Ring HolderSUS304/SUS316


Preperation:
1. Shaft Outside Diameter is within tolerance +-0.05mm
2. Shaft run out <0.1mm
3. Shaf end float <0.13mm
4, No sharp edges on the shaft over the o ring


Note:
During the installation,don't scratch or damage the o ring.lf anything is damaged,please contactwith Us to replace a new one.


Installation in strucstions:
1. The full set of cartridge seal is cleaned and exactly passed leakage examine before sale.Inorder to avoid damage,don't disassemble and clean the parts again before fixing.


2 The fitting allowance between the seal and shaft is dl h6 0.8,and there should be leading-inedge at the end of shaft.The outside diameter of shaft at the position of screw should be 01 0.2mm smaller,resisting the screw over-tighten.Lubricate the shaft with oil


3. Place the cartridge seal into the pump chamber,then:
A: Tighter four screw bolts of flanges,ensuring the medium leading in hole"G"at the top Position

B : Tighter four set screws and position the shaft sleeve on the shaft.
C: Remove four gauge plates.Please keep them and they wil be used in future installation and
disassemble.
D: Connect the medium lead_in pipe with hole"G"in order to flush away the friction heat and
flushing the seal chamber when pump running.


Note:
ter complete the installation,turning the shaft by hand to check for the rotationi he shat could not rotate smoothily,seal had been improperly installed.


We would like lo sincerely ooperale with Clients to supply high qually products and senice We beleve in establishing a long:erm cooperalive relalionshipis lhe key to suceess

China Grundfos Shaft SIC Mechanical Seal For Water Pump CH2-30/4-30 CH-12mm supplier

Grundfos Shaft SIC Mechanical Seal For Water Pump CH2-30/4-30 CH-12mm

Inquiry Cart 0