

Add to Cart
Product Name | Carbon Steel Pipes |
Length | 4m-12m or as required |
Out Dia | 20mm-610mm |
Wall Thickness | 4mm-70mm |
Standard | ASTM A106, ASTM A53, API 5L Gr.B, DIN17175,DIN1629 |
Technique | Hot rolled |
Surface Treatment | Clean, blasting and painting according to customer requirement |
Dia tolerance | Control with in the standard, OD:+-1%, WT:+-10% |
Material | 10#,20#, 45#,16Mn,A106(B,C),A53(A,B),API J55,API K55,Q235,Q345,ST35.8,ST37,ST42,ST45,ST52 |
Application | It is mainly used to make structural parts such as car girder,
beam, transmission shaft and car chassis parts, which can reduce
the weight of the parts. |
MOQ | 25tons. We also can accept sample order. |
Shipment time | Within 15-20 workdays after receiving deposit or L/C |
Export packing | Waterproof paper, and steel strip packed. Standard Export Seaworthy Package. Suit for all kinds of transport,or as required |
Capacity | 250,000 tons/year |
We have a strict quality system, the raw materials of each order
will be tested before production, and a rolling mill test
certificate will be provided to customers.
We always package steel products well.
We always fix steel product in container well to make it safe
arrive at destination port.
We always provide best and professional forward service and after
sales service.
WhyOUR SERVICE:
1.Provide free sample.
2.We have full stock and can deliver within short time.
3.OEM and ODM order are accepted, Any kind of logo printing or
design are available.
4.We offer you the different types of product.
5.Good Quality + Factory Price + Quick Response + Reliable Service,
is what we are trying best to offer you.
6.All of our products are produced by our professional workman and
we have our high-work-effect foreign trade team, you can totally believe our service.
After you choose:
1. We will help to compare the most cheapest shipping cost and send it to your email.
2. Start production immediately after receiving the advance
payment.
3.About 10-15 working days to complete the production, and then the
customer side to pay the balance.
Choose us
Choose us
Why Choose us
FAQ
Q1: Do you provide free samples?
A:Of course, we can provide free samples to all over of the world for testing, buyer should
bear the shipping cost.
Q2:What product information do I need to provide?
A:Please kindly provide the grade, width, thickness, surface
treatment requirements, and the quantity to order.
Q3:It's my first time to import steel products, can you help me
with it?
A:Sure, we have the shipping agent to arrange the shipment, and we will
work together.
Q4:What ports of shipment are there?
A:Under normal circumstances, we ship from Shanghai, Tianjin,
Qingdao, Ningbo ports, you can specify other ports, according to
your needs.
Q5:What about product prices information?
A:Prices varied, according to periodic price changes of raw
materials.
Q6:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shipment or based on BL copy or LC at sight.
Q7:Do you provide ODM services?
A:Yes, if you have your own design, we can produce according to
your specification and drawing.
Q8:What are the certifications for your products?
A:ISO 9001, MTC, third parties' inspections such SGS, BV, ect. are available.
Q9:How long does your delivery time take?
A: Generally it is 7 days if we have the exact goods in our stock. If
not, it will take around15-20days to get goods ready for delivery.
Q10:How many countries you already exported to?
A:We have exported to America, Canada, Brazil, Chile, Colombia,
Russia, Ukraine, Thailand, Myanmar, Vietnam, India, Kenya, Ghana, somalia and other African countries. Our export experience is rich, we familiar with different market
demands, can help customers avoid a lot of trouble.
Q11:Can I go to your factory to visit?
A:Of course, we welcome customers from all over the world to visit
our factory.
Q12:Does the product have quality inspection before loading?
A: Of course, all our products are strictly tested for quality before
packaging, and unqualified products will be destroyed and customers
can appoint third parties to inspect the products before loading
too.