

Add to Cart
Automatic Machine Blowing Machine 30000L 7 Layers Plastic Injection
PRODUCT DETAILS
12'Siemens touch screen+World advanced MOOGparison thickness control system.
Integral electric cabinet, equipped with air conditioner,can adapt
to abnormal weather working environment.
Siemens remote control system,Equipped withSchneider soft starter.
Siemens remote control system,Equipped withSchneider soft starter.
The screw adopts cast aluminum heating ring forheat conduction effect, and the independent coolingfan hood is closed quickly to control the temperaturedeviation.
Lubricating pump, cleaning guide rail, smooth operation.
Huayu patented three-cylinder rapid opening andclosing mold locking system.
Q&A:
Q2: what is the warranty period of your machine?
Answer: The free charge guarantee term is 12 months after the
installation and adjustment in your factory.
Q3: what if my machine damaged doing the warranty period?
Answer: firstly, our engineer will help you to diagnose the problem
via online guidance. if any parts damaged during the warranty
period, we will send the parts to you for replacement free of
charge. If you can not fix he problem by replacement of the new
parts, we will send engineer to your factory to help fixing the
machine.
Q4: what is the delivery time of your machine?
Answer: Normally it would take about 90-120 days to complete the
machine.The specific time needs to be based on your machine.
Q5: can you provide us the machine drawings and technical proposal?
Answer: yes. After receiving your detailed requirement and product
drawings, our engineer will come out with the suitable
technical proposal with the basic machine concept drawings to you.
Be size after you placing the order we will send you the more
detailed technical configuration of the machine to you for
confirmation. Only after you confirming the technical configuration
then we will start the manufacturing process.
Q6: what’s your payment terms?
Answer: we can accept the following payment terms: T/T, L/C,
Alibaba .
Q7: how can we install the machine?
Answer: you provides the invitation letter for visa applying once
the machine to be shipment. We’ll dispatches one engineer and one
English interpreter to your factory once the machine arrive your
factory or as the your request.