3PE Steel Pipe Anti-corrosion Machine,High Efficiency epoxy coating machine

Brand Name:HUASHIDA
Certification:ISO9001
Minimum Order Quantity:1
Delivery Time:come to an agreement in respect of the delivery time
Payment Terms:L/C
Place of Origin:Qingdao,Shandong,China
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: 69 Jinsheng Second Road Chengyang District, Qingdao, Shandong, China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

3PE Steel Pipe Anti-corrosion Machine,High Efficiency epoxy coating machine

Production description

Process parameters of winding anticorrosion:
Production line size: 20 m X 15 m
Total water consumption: 30 cubic meters
Total power consumption: 450 kilowatts
Total gas consumption: 6 cubic meters / min.
Temperature condition: the temperature inside the workshop is higher than 5 degrees.

Automatic steel pipe bends fittings 3LPE coating line

is an advanced solution to apply 3LPE/FBE external coating on steel pipe bends, which are widely used in pipeline systems for the transmission of oil, gas, water and other fluids.They have highly resistance to corrosive from chemicals, moisture, harmful environment etc.

Winding anticorrosive steel pipe parameters
Diameter of steel pipe: 426, 630, 720, 820
Curvature radius: 4-6 times D
Elbow angle: 15-90 degrees.
Steel tube wall thickness: 8 mm -12 mm
Epoxy powder thickness: greater than 170 um
AD copolymer adhesive thickness: 170-250 um
PE layer thickness: 2.5 - 3.7 mm

Qingdao Husta machine arc pipe external winding 3pe anti-corrosion technology: through the epoxy resin material FBE and polymer material HDPE and adhesive material EVA jointly adsorbed to the surface. Improve the corrosion resistance of the pipeline, effectively protect the pipeline from corrosive media, extend the service life of the pipeline to 30-50 years, and save the replacement and maintenance costs.


Steel pipe outside shot blasting derusting operation line
No.DescriptionQty.Remark
1Transmission line1set
2Shot blasting derusting line1set
3Cyclone dust collector1set
4Pulse filter cartridge dust collector1set
5Centrifugal wind blower1set
6Derusting equipment electrical control system

1set

Steel pipe outside spiral 3PE production line
No.DescriptionQty.
1Coating transmit system1set
2Intermediate frequency heating system1set
3Epoxy spraying system1set
4Automatic feeding dryer2sets
5single screw high efficiency extruder SJ-65/30

1set

6SJ-120/30 extruder1set
7Hot melt adhesive extrusion die head1set
8PE sheet extrusion die head1set
9Hot melt adhesive/PE sheet press device1set
10Stainless steel spray powder chamber1set
11Cooling water spray system1set
Platform system
No.DescriptionQty.
1Steel pipe up load platform1set
2Derusting transition platform1set
3Finished pipe storage system1set
4Hydraulic system3sets
Grooving system
No.DescriptionQty.
1PE grooving device2sets
2Hydraulic elevating pipe turner2sets
3Operating cabinet1set


Overall dimension: 20 m X 15 m
Installed power:450 kw

Water: 30 m3
Compressed air: 6 m3/ min.
Temperature: 5
Pipe diameter range: 400-1220mm
Radius: 4-6D
Angle: 15-90 degrees.
Wall thickness: 8 mm -40mm
Epoxy powder thickness: ≥170 um
Adhesive thickness: 170-250 um
PE layer thickness: 2.5 - 3.7mm


Technological processes:
Upload pipes→pipes screw conveyor→rust removal of intermediate frequency heating→Epoxy powder coating→outer layer soli quid & polyethylene coating→cooling spray→pipes screw conveyor→grinding pipes, send→unload pipes


Our Services
3LPE coating processing line Quality guarantee period:12 months or 14 months from date of Bill of Lading.
During this period, the seller will provide free service for all problems caused by quality of equipments, however except the problems caused by the buyer .because of wrong operation.
Service:The seller would send technician to the buyer's factory to test the new machine and train people of the buyer. The buyer should pay for round-trip transportation expense, food, accommodation, insurance locally and related salary.

The traditional 3pe anti-corrosion production line generally has three forms, whether it is the double-layer epoxy powder Ownchart operation method, or the manual heating installation method of polyethylene heat shrink sleeve, there are obvious defects to a certain extent. How to avoid all the above defects has become the direction of technological development, and it is the purpose of achieving high-quality anticorrosion in the real sense.






China 3PE Steel Pipe Anti-corrosion Machine,High Efficiency  epoxy coating machine supplier

3PE Steel Pipe Anti-corrosion Machine,High Efficiency epoxy coating machine

Inquiry Cart 0