Epoxy Powder Coating Equipment For Steel Pipe,FBE equipment (external coating on pipe)

Brand Name:HUASHIDA
Certification:ISO9001
Minimum Order Quantity:1
Delivery Time:come to an agreement in respect of the delivery time
Payment Terms:L/C
Place of Origin:Qingdao,Shandong,China
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: 69 Jinsheng Second Road Chengyang District, Qingdao, Shandong, China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

External FBE Coating Equipment,Maneuverable PP Coating Equipment For Steel Pipe

INTRODUCTION
3PE coating line is to make anti-corrosion of kinds of steel pipes, such as single layer FBE, double layer FBE, double layer PE, double layer PP and 3PE.
The line includes systems of steel pipe transportation, surface disposal, dust catching, pipe heating, electrostatic spraying, coating, water cooling, edge cutting, hydraulic and pneumatic device, detecting and electric controlling system.

Here's a brief overview of the three layers that make up the 3PE coating:

  1. Epoxy Resin Layer (Adhesive Layer): The first layer, typically a fusion-bonded epoxy (FBE), acts as an adhesive between the steel pipe and the subsequent layers. It provides excellent adhesion strength and corrosion resistance, ensuring that the coating system adheres firmly to the pipe surface.

  2. Adhesive Layer: The second layer is a specialized adhesive that bonds the epoxy resin layer to the outer polyethylene layer. This layer is critical in preventing the delamination of the coating system under various environmental and operational stresses.

  3. Polyethylene Layer: The outermost layer is made of high-density polyethylene (HDPE), which provides the primary barrier against corrosion, moisture, and other external factors that can deteriorate the pipe's integrity. HDPE is known for its durability, flexibility, and resistance to chemical attack and mechanical damage.


Description:
3PE anti-corrosion coating production line means the steel pipe is protected by three layer to prolong the life of use from 5-10years to 50-100years.
First layer is Fusion bonded epoxy layer (FBE> 100µm), the second layer of adhesive (AD) 170 ~ 250µm, the third layer of polyethylene (PE) 2.5 ~ 3.7mm. Present we can made the machinery for diameter range Φ159 ~ Φ1220.
3PE steel pipe outer coating has a high mechanical strength, excellent electrical insulation performance. The merits include high degree of mechanization, process parameters stable, not pollute the environment, etc. In recent years, the intensive of the pipeline corrosion engineering has been widely used.


No.NameSet
A. Derusting Equipment
1Pipe-converying Equipment1
2Shot Blast Cleaning Machine1
3Cyclone Dust Collector1
4Pulse dust collector1
5Centrifugal exhaust fan1
6Rust removal equipment PLC1
B. Coating equipment
1Coating transfer equipment1
2IF heating device1
3Powder spraying device1
4Automatic loading dryer2
5SJ-65/30 Extruder1
6SJ-180/30 Extruder1
7Hot melt adhesive extruder die1
8PE sheet extruder head mold1
9Hot melt adhesive/PE sheet coating device1
10Environmental Protection Ventilation equipment1
11Cooling Spray equipment1
C.Platform Equipment
1Steel pipe platform1
2Post-rust removal transition platform1
3Product tube storage platform1
4Hydraulic Equipment3
D.Groove Equipment
1PE Beveling Machine2
2Hydraulic Lifting and Turning Machinery1
3Hydraulic Equipment1
4PLC1
E.Compressed air Equipment
1Screw Air Compressor1
2Cold dry machine1
3Precision filters3
4Gas tanks1



The technological processes employed by Huashida Machinery for the 3LPE coating of steel pipes involve a series of meticulous steps designed to ensure the highest level of quality and durability. Here's a detailed overview of the process:

  1. Upload Pipes:
    • The process begins with the loading of the steel pipes onto the production line. This step ensures that the pipes are positioned correctly and ready for processing.
  2. Pipes Screw Conveyor:
    • Once loaded, the pipes are transported through the production line using a screw conveyor. This efficient system gently moves the pipes forward, allowing for continuous and uninterrupted processing.
  3. Rust Removal via Intermediate Frequency Heating:
    • To ensure a smooth and even coating, it's crucial to remove any rust or impurities from the pipe surface. This is achieved through intermediate frequency heating, which raises the temperature of the pipe surface to effectively burn off rust and contaminants.
  4. Epoxy Powder Coating:
    • Following rust removal, the pipes are coated with an epoxy powder primer. This layer acts as a corrosion-resistant barrier, providing a strong foundation for the subsequent coatings.
  5. Outer Layer Solidification & Polyethylene Coating:
    • Next, the pipes undergo the application of the outer layer, which consists of a solidified coating and a polyethylene layer. The solidification process ensures that the coating adheres firmly to the pipe surface, while the polyethylene layer provides additional protection against corrosion and wear.






China Epoxy Powder Coating Equipment For Steel Pipe,FBE equipment (external coating on pipe) supplier

Epoxy Powder Coating Equipment For Steel Pipe,FBE equipment (external coating on pipe)

Inquiry Cart 0