Angle Steel Pre Engineered Storage Buildings For Construction

Brand Name:XGZ
Certification:CE EN1090,ISO9001
Model Number:XGZ-PEB009
Minimum Order Quantity:100 square meters
Delivery Time:30-55 days
Payment Terms:T/T, L/C, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: No. 268 Shenzhen Road, Pingdu City, Qingdao, Shandong Province.
Supplier`s last login times: within 21 hours
Product Details Company Profile
Product Details

Convenient Transportation Pre-Engineered Steel Structure Building For Construction


Product Description


Prefabricated steel structure building is one of the innovative technologies in building construction solutions. Its econimical price, convinient tranportation and quick installation make it more and more polular in construction area.
Prefabricated steel structure building is usually component by H steel column, H steel beam, purlin, roof sheet, wall sheet, rolling door and windows, etc.
All of main structure part (H column & beam) will be fixed by high strength bolts and the purlin will be fixed on the column and beam by 4.8S bolts, which makes the building frame erection faster than traditional concrete construction system.
Pre-engineered teel structure b’s roof and wall is steel sheet or sandwich panel, which is lighter and spend less time to erect.


Product Parameters


Main steel frameH section steel beam and columns
Secondary frameGalvanized C/Z purlin , steel bracing , tied bar , knee brace , edge cover etc.
Roof & Wall panelSandwich panel ,corrugated steel sheet or skylight panel
Tie rodCircular steel tube
BraceRound bar
Knee braceAngle steel
Roof gutterColor steel sheet or galvanized steel sheet
RainspoutPVC pipe
DoorSwing door,sliding door or roller door
WindowsPVC steel or aluminum alloy window
WindowAluminium Alloy Window / PVC Window
ConnectingAnchor bolt, high-strength bolt , common bolt
PackingAccording to the pack list made by our engineer

The principle of steels selection is not only to make the structure safe and reliable and meet the requirements of use, but also to save material and reduce cost. In order to ensure the bearing capacity of the bearing structure and prevent the brittle failure that may occur under certain conditions, the following factors should be considered comprehensively: the importance of the structure, the nature of the load, the connection method, the working environment of the structure, and the thickness of the steels.


Product Features


Advantages of steel structure pre-engineered building:
1. Environmental friendly, Most of the excess material can be 100% recycled
2. Lower cost and maintenance
3. Fast construction and easy installation, time saving and labor saving
4. Good appearance
5. Stable and Earthquake Resistance, Wind resistance, Sound insulation


Design and Quote


We will provide with you free design service, please kindly inform us the following informations:

1. Project site location;
2. Overall dimension (length*width*eave height);
3. Mezzanine or not? How many kgs of load per square meter on mezzanine?
4. Single-layer steel sheet wall or sandwich panel wall;
5. Snow load if applicable;
6. Wind speed/load;
7. Interior column allowed or not;
8. Overhead crane needed or not, capacity?
9. Any other particular requirements?


Application


Pre-engineered steel structure building can be used in the construction of the following buildings:
1. High rise buildings
2. Office buildings
3. Shopping mall
4. Factories
5. Warehouses
6. Workshops
7. Logistics centers
8. Surpermarkets
9. Factories
10. Poultry buildings


Product Processing


After the customer confirms the construction drawing and the engineer draws the 3D model, the process will enter the processing step, which is mainly divided into the following steps:

1. Cutting
Steel components, such as beams, columns, and plates, are precisely cut to the required dimensions using advanced cutting techniques, such as Automatic laser cutting machine, to ensure accurate fitment during assembly.
2. Assemble
The cut steel pieces are fitted together according to engineering drawings and specifications.
3. Welding
Welders employ various welding techniques, to join the steel components securely. Welding creates strong and resilient connections, enhancing load-bearing capacity.
4. Rust removal
Before surface treatment, any rust or scale on the steel surfaces must be removed. Techniques like sandblasting, shot blasting, or chemical cleaning are used to eliminate corrosion, creating a clean and smooth surface.
5. Surface treatment
Spray painting or hot-dip galvanizing according to customer's requirements, so that the surface is not corroded.


XGZ Service


Xinguangzheng has decades of experience in custom designing and prefabrication of high quality steel structures. We put our customers first. We will consult with you to determine your precise needs, then creates frame, sandwich panel, roof, windows, doors and other materials to realize the best building possible for you.

Services of Xinguangzheng Group
1. Make suitable design plan and detail construction drawings of PEB steel structure building according to the land layout area and usage of building by Tekla, PKPM, 3D3S.
2. PEB steel structure building consultation service.
3. Budget offers of building for contractor.
4. Transportation & delivery as your need.
5. Fabrication,shot blasting & painting as different request.
6. Erection & installation of PEB steel structure building. Our technician and skilled workers can be on site to guide or install the building as need.


FAQ


1. Are you factory?

Yes, our factory produce and sell steel structures many years. We have a lot of experience at the steel building manufacturing area.

2. How can I get a quotation for my projects?

You can contact us by email, phone, WhatsApp, Skype, and so on and you will get reply within 7 hours.

3. Do you offer designing service for us?

Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc.

4. Can you send engineers or whole team to install my project?

We will give detailed installation drawings and video for free. We can send engineers as installation director or a team upon request.

5. Can we visit your factory?

Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

China Angle Steel Pre Engineered Storage Buildings  For Construction supplier

Angle Steel Pre Engineered Storage Buildings For Construction

Inquiry Cart 0