High-Strength Heavy Steel Structure Building For Industrial And Commercial Applications
Product Description
Pre-engineered heavy steel structure buildings redefine the way
that construction are undertaken in the world today. The days of
putting up industrial building by block and concrete appears to be
a thing of the past, clients nowadays are more in need of faster
construction with better quality control and easier installation.
Fabricating the pre engineered heavy steel structure buildings in a
strick controlled factory have varieties of advantages than
tranditional construction ways. It is more and more attractive
bacause lower cost of transportation, installation, etc.
Pre engineered heavy steel buildings have extremely superiority in
industrial and commercial projects, such as warehouse, workshop,
plant, storage, 4S exhibition room, office building, shopping mall,
school building, etc. Greatly saving on cost, shorting completion
time and and gaining durability, these all make pre engineered
buildings to be the first choice of construction solution.
Product Parameter
The steel components of heavy steel structure buildings are customized, and the following table is a reference. We will design according to customer needs and local wind pressure, snow load, etc., using steel components with corresponding strength.
Name | Heavy Steel Structure | |
Main Steel Frame | H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe | |
Secondary Frame | Hot dip galvanized C purline, steel bracing , tie bar , knee brace , edge cover etc. | |
Roof Panel | EPS sandwich panel,glass fiber sandwich panel,rock wool sandwich panel,and PU sandwich panel or steel sheet | |
Tie Rod | Circular steel tube | |
Brace | Round bar | |
Knee Brace | Angle Steel | |
Roof Gutter | Color steel sheet |
Production Features
The features of the heavy steel structure buildings are as follows:
1. Lower price and shorter construction period, saving cost of
foundation.
2. Easy to assemble and disassemble.
3. High durability and easy to maintain.
4. Various designs available, customized designs acceptable.
5. Healthy and safety, less waste during workshop constructs.
Design and Quote
We can help your idea drawing come true, if not drawing yet, after clear on the following infos,we can prepare drawing accordingly for you.
1. The local site Max. wind speed;
2. Snow load if there is snow in local;
3. Size of the heavy steel building (length*width*eave height);
4. Roof and wall material;
5. There is crane inside the building or not; If have, pls confirm
the lift tons;
6. Drawing or more specification if have.
Product Processing
The components of the heavy steel structure building are transported to the site after the production of the workshop for assembly, which is mainly divided into the following steps in the workshop processing:
1. Material Preparation
Steel materials, such as beams, columns, and plates, are received
and inspected for quality. They are organized and prepared for
further processing.
2. Cutting and Shaping
The steel components are cut to the required sizes using cutting
techniques like sawing, shearing, or plasma cutting. They are then
shaped using processes such as bending, rolling, or pressing to
achieve the desired form.
3. Welding and Joining
The individual steel components are joined together using welding
techniques, such as arc welding or gas welding. This creates strong
and secure connections between the different parts of the
structure.
4. Surface Treatment
The steel components may undergo surface treatments like shot
blasting or painting. These treatments help to remove impurities,
improve the surface finish, and provide corrosion resistance.
5. Quality Control and Inspection
Throughout the processing stages, quality control measures are implemented to ensure that the components meet the required standards and specifications. Inspections are conducted to identify any defects or inconsistencies that need to be addressed.
6. Packaging and Storage
The finished steel components are carefully packaged and stored in the factory to protect them from damage and ensure their readiness for transportation.
Packaging
Packaging Detail:
The packing method for main steel frame will use steel pallet,
which can be better to protect steel frame and make the loading and
unloading faster and more convenient since it could be taken as a
whole. It could also save the quantity of shipping containers and
cost of ocean freight.
Other parts packed in parcels such as steel purlin and steel sheet,
all loaded into containers. Safe and easy handle.
Our Advantages
Services of Xinguangzheng Group
Our company can design, fabricate, load and erect the heavy steel
structure building according to clients’ need.
1. Make suitable design plan and detail construction drawings
according to the land layout area and usage of building by Tekla,
PKPM, 3D3S.
2. Heavy steel structure building consultation service.
3. Budget offers of building for contractor.
4. Transportation & delivery as your need.
5. Fabrication,shot blasting & painting as different request.
6. Erection & installation of heavy steel structure building.
Our technician and skilled workers can be on site to guide or
install the building as need.
FAQ
1. What kind of company you are?
We are steel structure building Manufacturer located in Qingdao China. We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. Also, you will get best and most competitive price after visiting us.
2. Can you offer design service?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc
3. How can you get a quotation for your projects?
You can contact us by email, phone, WhatsApp, Skype, and so on and you will get reply within 7 hours.
4. What is your terms of payment ?
30% deposit is paid in advance, and the balance is paid before shipment; it can be negotiated according to specific projects.
5. How long does it take to get my building?
Lead time is vary, but typically 2 weeks of drawings and 30-55 days for delivery(depending on complexity).