

Add to Cart
Product Descri
Undercarriage spare parts: | Track shoe, Track Link, Bolt, Track roller, Carrier Roller,
Sprocket, Front Idler, Idler Cushion ...... |
Engine spare parts: | Engine assy,Cylinder Head,Cylinder Block,Turbocharger,Piston,
Piston Ring, Metal, Crankshaft, Oil Pump, Fuel injection Pump,Water Pump, Alternator, Starting Motor ...... |
Hydraulic spare parts: | Main Valve, Main Pump, Solenoid Valve, Boom/Arm/Bucket Cylinder,
Final Drive, Travel Motor, Swing Machinery, Swing Motor ...... |
Operator's Cab spare parts: | Cab Assy, Monitor, Controller, Engine Controller, Wiring Harness,
Seat, Air Conditioner, Air Compressor...... |
Cooling parts: | Radiator, heat sink, air conditioner, compressor, after cooler ,
water cooler hydraulic oil cooler ...... |
Other parts: | Service kit, swing circle, engine hood, swivel joint, fuel tank,
filter, boom, arm, bucket |
About Xinfeng Machinery (XF) parts:
Theory
When replacing a Carter swing motor, pay attention to the
following:
Safety first: Before replacing the motor, be sure to disconnect the
power supply and confirm that the equipment has completely stopped
running to avoid accidental injuries.
Select a suitable replacement motor: Make sure that the selected
replacement motor matches the specifiions and parameters of the
original motor, including power, voltage, speed, etc.
Check the installation space: Before replacing, check whether the
installation loion has enough space to accommodate the new motor,
and make sure that the installation loion meets the installation
requirements of the new motor.
Connection method: Pay attention to the wiring method of the
original motor and ensure that the wiring method of the new motor
is consistent with it to avoid wiring errors that may cause
malfunctions or dangers.
Fixed installation: When installing the new motor, ensure that it
is firmly fixed to avoid vibration or displacement during
operation.
Lubriion and maintenance: After replacing the motor, lubrie and
maintain it according to the requirements of the new motor to
ensure its normal operation and extend its service life.
Test operation: After the replacement is completed, first perform a
no-load test to ensure that the new motor can start and operate
normally, and then perform a load test to ensure that its
performance meets the requirements.
If you have any questions or need further assistance about
replacing a Carter swing motor, please feel free to ask.
Advantages
Warehouse Display
Packaging and Delivery
FAQ
1. How to quickly and accurately buy products what lneeded?
A: Provide the original parts number to us to check.
2. How long have you been in the excavator
A: We are engaged in excavator parts since 1998
3. lfI don't know the part number,what shouldI do?
A: Please send us size and pictures of old products.
4. What is the warranty of the products?
A: The warranty is 6/12 Months based on the specific product.
5. How long is your delivery time?
A: The normal delivery time is 3-5 days for stock sproductsafter
getting payment. lf not in stock, we will inform you thetime
requlred.
6. Which shipping term you can supply?
7. What is your MOQ?
A: Small order and sample order are acceptable
8. Do you have any After-Sales service?
A: Yes!Our