

Add to Cart
This box-type integrated computer room product has been specifically developed to cater to the requirements of rapid site construction of photovoltaic power generation systems. It includes AC and DC power distribution, inverters, and monitoring and communication equipment required for photovoltaic grid-connected power generation systems, which have been installed in a specially sealed box. Its purpose is to complete the grid-connected control, data collection, and remote transmission functions of photovoltaic power generation systems.
The product has been created with the aim to meet the urgent needs of photovoltaic power generation systems for rapid site construction. Comprehensive considerations have been taken into account, such as reducing the amount of foundation construction, reducing the difficulty of on-site installation, construction, and on-site wiring.
Comprising of inverters, AC and DC power distribution cabinets, monitoring and communication boxes, fire boxes, tool boxes, inlet and outlet units, emergency lights, and other ancillary equipment, this product is assembled ready-made in the factory. The fully-functioning and tested product is then transported to the site. On the construction site, the incoming and outgoing lines of the photovoltaic power generation unit need only to be connected to both ends of the equipment to complete the installation. This factory-based and modular construction approach means that power stations can be built quickly and with ease, successfully shortening the on-site construction period.
High-voltage and Ultra-high-voltage Transmission Stations
High-voltage and ultra-high-voltage transmission stations are typically constructed in wide, open wilderness areas. The primary main equipment, which includes transformers and circuit breakers, needs to take up a large outdoor space to ensure safe operation. On the other hand, the secondary control and protection equipment and power control equipment must be installed indoors to avoid exposure to harsh weather conditions and external interference. This dual nature of indoor and outdoor equipment makes the design of transmission stations complex and challenging to ensure optimal performance.
Environmental and Construction Limitations
The construction of high-voltage and ultra-high-voltage transmission stations on wilderness sites faces various environmental limitations. The natural terrain, soil composition, and the presence of water bodies can sometimes hamper the ability to excavate the ground and lay foundations for the plant. In addition, labor costs are usually high when working in remote areas with limited access to skilled workers and materials. The result is a much longer construction time and higher costs, and in many cases, this limits the scope and scale of the project.
One-stop Service
For any successful transmission project, it is crucial to have a streamlined and efficient process, which is where one-stop service comes in. This service offers an all-inclusive approach that simplifies and shortens the time it takes to deploy the required resources for project completion.
Door | Customized |
Type | Solar Power Container |
Dimension | Customized |
Material | Q235B/SPHC |
Color | Customized |
Capacity | Customized |
Accessories | Customized |
The PV power container is an ideal solution for a variety of occasions and scenarios, including:
The solar energy container can be customized according to specific requirements, such as:
The solar powered container is easy to install and operate, requiring minimal maintenance and supervision. It has a long service life and can provide clean and renewable energy for many years. ZOYET Solar Power Container is a reliable and cost-effective solution for anyone who needs a sustainable source of electricity in remote or off-grid locations.
Minimum Order Quantity: 1
Price: USD 1.00-100000.00 unit piece
Delivery Time: 5-30 days
Payment Terms: T/T
Supply Ability: 1000 pieces per month