Injection Molded Plastic Parts Tote Box Storage Containers For Moving

Brand Name:Chenyang
Certification:ISO9001,CE, RoHS,GBT24001,GBT28001,IAFT16949 EN15085 OHSAS18001 ISO 45001
Model Number:CY-S-108
Minimum Order Quantity:100 PCS
Delivery Time:15-20 work days
Payment Terms:L/C, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao China
Address: NO.5 Yunshui 2nd Road, Automobile Industry New Town, Jimo Dirstrict, Qingdao, China
Supplier`s last login times: within 26 hours
Product Details Company Profile
Product Details

Plastic Material Injection Molding Parts Tote Box Storage Containers for Moving

Injection molding is a widely used manufacturing process for producing plastic parts and products. It's known for its versatility, efficiency, and ability to create complex, high-quality components. Here's an overview of the injection molding process:

Mold Design and Creation:

  • The process begins with the design of a mold, which is a two-part tool (the cavity and core) that defines the shape of the final plastic part.
  • The mold is typically made from steel or aluminum and is precision-machined to meet the exact specifications of the desired part.

BrandChenyang
Our productsHigh-speed rail/ bullet train/ subway spare parts, Fitness/ massage equipment spare parts, Wind power accessories, Automobile / motorcycle spare parts, Solar street light spare parts, Telecommunication and security equipment spare parts, Water filter accessores, Plastic air filter spare parts, Fire Accessories etc, such as Sheet plate series, Cabinet Series,Die casting series, CNC machining series,Injection plastic series etc
Place of OriginQingdao China (Mainland)
SizeOEM Standard Size
SurfaceMatte or gloss or upon clent's requirement
ProcessLasering, bending, welding, CNC machining, turining, milling, grinding machining
Available MaterialsAL:5052/5754/5082/5083/6061/6063/6082….
ZL101/ZL102/ADC12…
Carbon Steel: Q235B/Q345E/Q345D/SPCC/SECC/DX51D/DX53D…
Stainless steel: 304/316/430/201...
PaymentT/T, L/C, Money Gram, Western Union
DeliverySample: 3~5 days for no mould items and 7~10 days for mould items
Mass goods: 15~20 working days
China Injection Molded Plastic Parts Tote Box Storage Containers For Moving supplier

Injection Molded Plastic Parts Tote Box Storage Containers For Moving

Inquiry Cart 0