2000T/M Aluminium Anodizing Production Line With Multiple Rinsing Tank

Brand Name:MEI-AL
Model Number:APL-2000T
Minimum Order Quantity:1set
Delivery Time:180-200days
Payment Terms:T/T
Place of Origin:CHINA
Contact Now

Add to Cart

Verified Supplier
Location: Foshan China
Address: No. 1, Changgang North Road, Changhongling Industrial Park, Shishan Town, Nanhai City, Foshan City
Supplier`s last login times: within 38 hours
Product Details Company Profile
Product Details

2000T/M Aluminium Anodizing Production Line with Multiple Rinsing tank


一. Equipment Name:

1. The core of the production line is a series of anodizing tanks where the electrochemical oxidation process takes place. These tanks contain the electrolyte solution (e.g., sulfuric acid, chromic acid, or boric acid) and the aluminum parts are submerged and electrically charged to grow the oxide layer.

2.In between the anodizing tanks, there are multiple rinsing stations that use cascading water to thoroughly clean the parts and remove any residual chemicals.

3.After the anodizing and rinsing steps, the parts move through drying stations to remove any remaining moisture before further processing.

二. Design Condition:

1AlloyAluminium 6061 to 6063 or others
2Anodizing film thinknessThe desired anodizing film thickness is 10-12µm (microns)
3Average coverage areaThe average coverage area is 350m² per ton of aluminum profiles
4Maximum aluminum profile length6500mm
5Extrusion ratio2.5kg/m²
6Working hour/m300d/m x 20h/d = 600h/m
7Racking systemThree fixtures /rack
8Racking operationManual
9Equipment Usage Rate0.9
10Power supplyAC 3phase 380v 50hz
11Control PowerAC220V 50Hz
12Water supply2kg/cm²·G
13Hot steam6kg/cm²·G
14Compressor air6kg/cm²·G

四. Treatment Process:

  1. Degreasing
    (1) 6jig(rack)/ tank x 1 tank
    =6jig(rack)
    (2) treatment time: 2-5min
  2. Alkaline Etching
    (1) 6jig(rack) / tank x 2 tank
    =12jig(rack)
    (2) treatment time: 3-15min
  3. Neutralization
    (1) 6jig(rack) / tank x 1 tank
    =6jig(rack)
    (2) treatment time: 1-5min
  4. Anodizing
    (1) 3 jig(rack)/tank x 6tanks = 18jig(rack)
    (2) Current density: 130A/m²
    (3) Process time: 30min
    (4) Unprocess time: 10min
    (5) Total time 30+10=40min

(6) Average anodizing layer : 0.36*1.3*30*0.77 =10.81um

  1. Colour 1

1) Clour process: Mix Salts

2) Quantity:3 jig(rack)/tank x 1tanks = 3jig(rack)

3) Current density: 70A

4) Process time: 2-8min


6. Sealing
1) Sealing menthod: Sealing at Medium or Normal Temperature
2)
Quantity: 6jig(rack)/tank x 1 tank
3) Process time 10-15min

五.Process Tank

  1. Degreasing 【Free sulfuric acid 180±30 g/l】 1 Tank
  2. Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】 2 Tanks
  3. NeutralizationFree sulfuric acid180±20g/l】 1 Tank
  4. Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】 6 Tanks
  5. Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】 3 Tanks
  6. Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】 3 Tank

六. Design Parameter and Setting

1. Anodizing treatment area:
1) Each anodizing process tank need 40min ,where total jig(rack)/year:

( 3 rack x 6 tank x 60min/h) ÷40min x600 hour =16200jig(rack)

2) Design 50m²/jig(rack) . Where every tank is 100m²
3)
Area treatment/year : 16200jig(rack)x 50m² /jig =810000m²


2. Anodizing treatment weight:
Monthly output : 810000m²÷350m²/T*0.9=2082T≧2000T


3. Power consumption:
1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

Power Rectifier : 15000A =6unit
2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

Colour Rectifier : 8000A =3 unit


七. Process Chat

Discription for Un
1DeDegreasing
2RsRinsing
3HW RsHot Water Rinsing
4AEAlkaline Etching
5NeNeutralization
6AnAnodizing
7ClColoring
8SlSealing
9MUMaterial Unloading
10PcPacking


China 2000T/M Aluminium Anodizing Production Line With Multiple Rinsing Tank supplier

2000T/M Aluminium Anodizing Production Line With Multiple Rinsing Tank

Inquiry Cart 0