Full PU IAAF Standard Track , Eco Friendly Sports Running Synthetic Track

Brand Name:ASHER
Model Number:AR-SP-02
Minimum Order Quantity:1000 Square Meters
Delivery Time:7 work days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Place of Origin:Guangdong, China
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou Guangdong China
Address: 240 Hancock Avenue, Jersey City, New Jersey 07307, United States
Supplier`s last login times: within 24 hours
Product Details Company Profile
Product Details

Economical Synthetic Full PU System Running Track Sports Flooring School Playground

Advantages of Full PU Running Track

1. All weather suitable: there is no condition to weather and temperature ranged, it still can devote to use after heavy rain.
2. High flexible, cushion and shock absorb: due to Multi-layer system and Rubber granules, the flooring was soft and flexible, which can do an favor for athletes' performance and prevent from injury at the same time.
3. Anti-nail: it won't destroy by the spikes or start running frame even at the starting point of 100-meter.
4. Flatness: special machine for installation, you can adjust the machine make the thickness correspond to clients required.
5. Weather resistance: it won't fade,pulverized or intenerated by ultraviolet radiation, Ozone and the pollution of acid rain, which can keep the fresh color for a long time.
6. Pressing: it can rebound after the heavy equipment.
7. Viscosity: special construction disposal , it ahs the strong Viscosity, which can prevent the ascend of water, no pickle,separating, etc.


Material of Full PU (polyurethane)
  1. Base: The base layer is typically made of asphalt or concrete and provides a stable foundation for the track.

  2. Binder: A binder layer is applied on top of the base layer to help bond the subsequent layers together.

  3. Cushion: The cushion layer is made of a resilient material such as SBR (styrene-butadiene rubber) or EPDM (ethylene propylene diene monomer) and provides shock absorption and energy return for the athletes.

  4. Wear layer: The wear layer is the topmost layer of the track and is made of polyurethane. It provides a smooth and durable surface for athletes to run on.

Physical properties data

Serial number
Test project
Standard
requirements
CN-S05FCN-S05TCN-S05HCN-S05ZJudge
1
Shock absorption rate,%
30-5038.939.239.340.1Qualified
2Vertical deformation,mm0.6-2.51.742.022.402.4Qualified
3
Anti-slide value,BPN20℃≥
4757575657Qualified

4

Tensile strength,Mpa ≥0.5/0.4 permeable type0.80.40.620.51Qualified
5Tensile elongation,% ≥4076.74654.352.8Qualified
6Flame retardant level/////Qualified
7Thickness,mmQualified

Details Reflect Quality

1. Good impact resistance and elasticity, with a strong elastic layer and buffer layer, which can absorb strong impact and the surface is not easy to be damaged
2. Anti-slip treatment, the particles have been treated with anti-slip treatment, and can be used indoors and outdoors all-weather without being affected by climate conditions
3. No seams, strong adhesion, strong integrity of the site, no seams, beautiful colors. The same material as polyurethane glue, similar compatibility, strong bonding
4. Manufacturer's source of goods, manufacturer's supply, can be customized according to needs, a variety of specifications are available, sufficient supply, reliable quality

Products Description
1. otal system thickness approx.
9-18mm (we recommend 13mm).
Hard-wearing, long-lasting.
Suitable for all-weather and all-season use, with good anti-slip performance.
2. Environmental Tartan Track, non-toxic and harmless.
With strong elastic layer and buffer layer, strong impact absorption and high wear resistance coefficient.
Can handle constant toughest stresses by spikes.
3. High-quality innovative PU elastic material, high adhesion to the foundation, high cohesive strength, good toughness, mixed with environmentally friendly EPDM colored particles.
It meets IAAF standards and can be used in professional competition venues.

Quality requirements for runway foundation


Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.


(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.


(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜


(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.


(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.


(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.

Full Pour Athletic Track Construction Steps
We can arrange workers to go to the site for construction guidance.
If you are interested, you can contact us now.
Authority Testing Quality and safety
Project cases
China Full PU IAAF Standard Track , Eco Friendly Sports Running Synthetic Track supplier

Full PU IAAF Standard Track , Eco Friendly Sports Running Synthetic Track

Inquiry Cart 0