Ductile Iron Casting Parts Tie Rod Formwork Anchor Wing Nut

Brand Name:Twinkle Industrial
Certification:ISO 9001
Model Number:TIICP-101
Minimum Order Quantity:10 pcs
Delivery Time:20 work days
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Zhengzhou Henan China
Address: Xinghua S&T Industrial Park, Zhengzhou, Henan, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Galvanized Cast Iron Tie Rod Formwork Anchor Wing Nut Iron Casting Parts


Quick Detail:


· Ductile Iron Casting Wing Nut

· Ductile iron GGG40

· Sand Wet Casting

· Shot Blasting finish

· Building or Construction


Product Description:


Formwork Tie Nut Galvanized Cast Iron Tie Rod Formwork Anchor Wing Nut.

All of these items are popularly used for concrete formwork & shuttering systems, including wall, column formwork, slab formwork, beam formwork, etc.


Product Specifications:


CommodityDuctile Iron Wing Swivel Nut Iron Casting Parts Formwork Tie Nut
StandardASTM, DIN, JIS, EN, ISO, BS, JCSI, GB
MaterialGrey iron (HT200,HT250,HT300), Ductile iron (QT400-18,QT400-15,QT450-10,QT500-7)
Unit Weight0,05 kg ~ 1,000 kg.
ToleranceCT6-CT8
MachiningTurning, Milling, Drilling, Cutting, Reaming, Threading, Welding, Tooling, etc
Surface TreatmentShot blasting, Painting, Powder coating, Electroplating, Chrome plating, etc
PackageStandard wooden box package or as your customized package
Applications

Agricultural machinery, Petroleum machinery, Mining machines, Construction, Automotive & Truck, Medical, Marine, Railway & Train, Power lines, Furniture, Lighting, Flange, Valve and Pump, Electronic, Pipeline, etc.

BrandTwinkle Industrial

Product Applications:

Widely used agricultural machinery, petroleum machinery, mining machines, construction, automotive & truck, medical, marine, railway & train, power lines, furniture, lighting, flange, valve and pump, electronic, pipeline, etc.


FAQ


Q1. How can we get a quotation?

A: Please send the parts 2D drawing (in PDF format) and 3D model in IGS or STP format together with material, production technique, purchasing qty, etc, or provide sample to us.


Q2. What about the lead time?

A: 15-20 days for Sample making ,20 working days for mass production.


Q3. Do you have any MOQ limit for casting parts?

A: It depends on different parts. For some parts, 1 pc can be acceptable.


Q4. What is your payment term?

A: Mold: 50% payment in advance, balance after the sample approval.

B: Mass production: 30% payment in advance, 70% balance before shipment.


Q5. What is your quality control process?

A: Each casting parts will be provided with raw material report ( chemical composition and physical property), and dimension measuring report before shipment.


Q6. How about the packaging?

A: Standard wooden box package or as your customized package.

China Ductile Iron Casting Parts Tie Rod Formwork Anchor Wing Nut supplier

Ductile Iron Casting Parts Tie Rod Formwork Anchor Wing Nut

Inquiry Cart 0