Perforated Protection Screen Construction

Brand Name:Aoben
Certification:ISO9001
Model Number:Aoben-Safety Mesh-22
Minimum Order Quantity:200set
Delivery Time:10-25days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Active Member
Location: Shijiazhuang China
Address: Room 1412, Wanhao building, No.176 South of zhonghua street, Qiaoxi District, Shijiazhuang
Supplier`s last login times: within 22 hours
Product Details Company Profile
Product Details

Scaffoding System Blue Perforated Steel Safety Formwork Screen


Climbing frame formwork screen is often suitable for the construction of complex shapes such as cast-in-situ shear wall, frame, arc balcony and cantilever plate. It is mainly used for high-rise shear wall buildings, which can climb up or down along the building. According to the power source, it can be divided into hydraulic type, electric type, manual type, etc. And floor scaffold building climbing frame mesh.


Compared with the cantilever scaffold, it has the following characteristics:
1. Erect 4-5 floors high at one time, and then climb up one floor with each construction layer of the structure construction.


2. The lifting speed is fast, and the lifting of one floor takes only 30-40 minutes, which can meet the protection needs of one floor in three days for structure construction and two floors in one day for decoration construction.


3. It is more stable. Multiple adhesion and building exterior walls are adopted, and multiple horizontal protection is set, The operator is always within the protection range of the frame body.


4. Compared with the floor frame, it can save 75% of materials and 40% of material costs.


5. The comprehensive cost of the outer frame can be reduced by more than 50%.


Product NameOuter frame protective screen building peripheral net building safety protective screen
Product Specification1.2X1.8M Frame:20mmX20mmX0.5mm
Product materialGalvanized plate 0.4mm-0.8mm
Product colorGreen Blue also can be customized
Product advantage1. No need to turn over the shelf 2. Assemble at one time until the construction is completed, saving manpower and materials

China Perforated Protection Screen Construction supplier

Perforated Protection Screen Construction

Inquiry Cart 0