

Add to Cart
Sharp ppr pvc hdpe pipe cutter HT310 for Manufacturing Plant
Plastic pipe cutter description:
Place of Origin | Zhejiang, China |
Type | Cutting Tools |
Brand Name | HTXG |
Model Number | HT3010 |
Product name | Sharp ppr pvc hdpe pipe cutter HT310 for Manufacturing Plant |
Application | pvc ppr hdpe pipe cutting |
Color | red |
Material | Aluminum Alloy Body |
Handle material | Aluminum Alloy Handle |
Cutting diameter | 0-63mm |
Feature | Easy Operation |
Certification | CE |
MOQ | 20pcs |
OEM | OEM Acceptable |
Features:
Method of use as follow:
1. Open the lock of the cutter first.
2. Put the pipe diameter below 63mm in cutter
3. After cutting, clean the blade with rustproof oil and close the
handle for ready use next time.
Attention
When product used in winter, the pipe would be put in the lukewarm
water for heating at first to avoid burst because for cold and
fragile at cutting. If the edge of cutter appeared wear and tear at
using, loose the fixed screw and buy the same type of pipe blade
for change after using, we should push down the handle and spread
on rustproof oil. Product apply to rigid plastic pipe or aluminum
plastic pipe, but not to be applied on electric cable line and
steel pipe to avoid to cause cutter damaged seriously.
What do plumbers use to cut pipes?
Cut steel pipe with a hacksaw, reciprocating saw, or use a
steel-pipe tubing cutter. It works similarly to a copper tubing
cutter. Saw through plastic PVC pipe with carpenter's handsaw,
hacksaw, or use PVC pipe handsaw. Plastic pipe can also be cut with
a ratcheting PVC cutter.
FAQ
Q1: Why choose us?
We are a professional manufacturer of pipe hot melt welding machine
and pipe scissors.
Q2: Do you provide samples?
Yes, we could offer the sample for free of charge but freight is
not included.
Q3: How long is your delivery time?
Generally it’s 3-7days if the goods are in stock, or it’s 25-30days
if the goods are not in stock, and it vary a little according to
quantity.
Q4: What is your terms of payment?
A: Payment under USD1,000, 100% T/T in advance.
B: Payment more than USD1,000, 30% T/T in advance, balance before
shipment.
Q5: What is your packing?
A: usually by carton, and can be packed as your require.