8 Wings Gps And Camera Drone Power Lines Empty Weight 4kg

Brand Name:BOYU
Certification:ISO9001 CE FCC
Model Number:NPA-805H
Minimum Order Quantity:1set
Delivery Time:20 days
Payment Terms:L/C, T/T, D/P, D/A
Contact Now

Add to Cart

Verified Supplier
Address: Yipeng Industrial Part, 2 Xingli Road, Yixing, Jiangsu, 214200, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

8 Wings Powerline Drone For with GPS and Camera Empty Weight 4kg


Axle distance/Height1080mm/450mmEmpty weight4kg
Flight height0-1000m (adjustable)Maximum flight distance2-4km
Maximum tension8kgNo-load endurance25-30min
Maximum take-off weight14kgLoad endurance12-18min
CameraSingle Axis Gimbal 720PDiameter of traction rope2-4mm
Flying speed0~15m/minWorking Temperature-5℃---50℃
Fail-SafewithGPSwith
Battery16000mAh 6SFlight modeManual control; ATT; GPS

Functions:

GPS positioning, full-auto return, semi-auto return, runaway protection, headless mode, heading lock, low-voltage protection alarm, battery power backhaul, national exclusive high beam function,

OSD flight data real-time backhaul, etc.

Drone with DJI flight control system

1 set

Professional remote control

1 set

Dual channel charger

1 set

Tool kits

1 set

Battery voltage capacity checker

1 set

6.5” screen mobile phone

1 pcs

Aviation aluminum box

1 pcs

Spare screws

1 pack

16000mah high quality battery

3 pcs

Backup battery strap

4 pcs

Spare propeller

8 pcs



Application

1. During the construction of the State Grid, the trees in the primeval forest often encounter shrubs, primeval forests, etc. This will certainly affect the construction progress. When crossing the virgin forest, trees cannot be cut down. This undoubtedly adds a lot of difficulties to the construction of the project, and with a straight-line UAV, it is easy to fly over trees and drop guide ropes to the ground.

2. In the traditional silk laying operation of the Yangtze River, the towline can only be dragged across the water by a tugboat. The construction water surface must be sealed first. The closure of air routes will also cause huge economic losses to the country and the construction party. The staff stood on the ship and remotely dragged the helicopter with the guide rope to make the guide rope fly over the Yangtze River to avoid sealing.

3. Swamps, lakes, farmland, roads and mountains will also be encountered during the construction. When people can't realize the construction, the UAVs in this line also show their talents and complete the task.

4. In the process of circuit transformation, cross power charging often occurs. It is necessary to cross a new line on the basis of the energized line. In order to ensure the safety of construction personnel, traditional construction can only be used first. After the line is powered off and constructed, the unmanned machine overhead can be used to avoid power failure.


China 8 Wings Gps And Camera Drone Power Lines Empty Weight 4kg supplier

8 Wings Gps And Camera Drone Power Lines Empty Weight 4kg

Inquiry Cart 0