Edge Computing Dedicated Rack Data Center With Cooling System

Brand Name:Coolnet
Certification:CE ISO
Model Number:Mirco data center
Minimum Order Quantity:1pcs
Delivery Time:20-35 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Hefei Anhui China
Address: Room 303, 3rd Floor, Building C, Yingte Workshop, West Section of Yanglin Road, High-tech Zone Mechanical and Electrical Industrial Park, Hefei City Anhui Province
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Edge Computing Dedicated Rack Data Center With Cooling System


Product Introduction

The intelligent integrated cabinet is specially designed for the rapid layout of cabinets in the edge computing, which can realize the rapid construction of small computer rooms, and is equipped with data display industrial computer, environmental control system, lighting system, smoke alarm system, water leakage detection system, and temperature and humidity monitoring system. , air conditioning system, emergency ventilation system, power distribution system and other functions, can fully monitor and adjust the environment in the cabinet to ensure the stable operation of the equipment.


Core Features

1. Lower cost
The minimum floor area is only 0.7m2, the closed design, strong environmental adaptability, no need for decoration, flooring and other supporting projects, effectively reducing CAPEX, fully enclosed refrigeration improves the energy efficiency of the whole machine, reduces OPEX, and significantly reduces the total cost of ownership (TCO).


2. Better management
The one-stop after-sales service can deal with various equipment failures in a timely manner, saving time and worry; the standard dynamic monitoring system can be monitored and managed locally and remotely, and multiple outlets can be connected to the upper management platform for unified supervision and diversified support.


3. Integration
The integrated cabinet integrates multiple systems such as UPS power supply, power distribution, refrigeration, access control, cabinets, lighting, fire protection, dynamic environment monitoring, and emergency ventilation. Design, Procurement, Construction Process.


Technical Parameter


ModelEC08EC12EC20ERx
Power3KVA3-6KVA6-30KVA
Number of cabinets0.8m high cabinet, available space 8U1.2m high cabinet, available space 16UStandard 42U cabinet, free space 30U2-10 standard 42U glass door cabinets
Enclosed cabinetGlass door, IP5X, full cold and hot channel sealing
Power supply220VAC, 3KVA UPS, power backup customized as required, Class C lightning protection220VAC, 3-6KVA UPS, customized standby power, C-level lightning protection220V/380VAC, 6-30KVA UPS, power backup customized as required, Class C lightning protection
RefrigerationUnique air duct design, without air conditioner and outdoor unitRefrigerating capacity 3.5-6.5KW optional, variable frequency EC fan; Quick coupling; Low load anti condensation;Refrigerating capacity 3.5-10.5KW optional, variable frequency EC fan; Quick coupling; Low load anti condensation;
Monitor1U rack type monitoring host, monitoring temperature and humidity, door magnet, smoke sensor, electricity, etc., without display1U rack type monitoring host/10 inch touch screen monitoring host (0U), temperature and humidity, door magnet, smoke sensor, electricity, refrigeration monitoring10 inch touch screen monitoring host (0U), temperature and humidity, door magnet, smoke sensor, electricity, refrigeration monitoring

Certification


Factory View


Packing&Delivery


China Edge Computing Dedicated Rack Data Center With Cooling System supplier

Edge Computing Dedicated Rack Data Center With Cooling System

Inquiry Cart 0