PPE Plastic Injection Moulding Manufacturing Process High Productivity

Certification:ISO 9001,IATF 16949,ISO 13485, ISO 14001
Model Number:customized
Minimum Order Quantity:negotiable
Payment Terms:L/C, D/A, D/P, T/T, Western Union
Plastic modling type:Injection
Product name:Plastic Injection Part
Contact Now

Add to Cart

Active Member
Location: Xiamen Fujian China
Address: #1152-#1158, Chunguang Rd., Xiang'An, Xiamen city, Fujian,361101 China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Plastic Mold (Mould) production process


1. 3d Design/Samples for quotation: According to 3D drawing or samples for quotation.


2. Negotiations: Including the price of moulds, moulds sizes, material for cores & cavities, weight of product, product color, payment, moulds lifetime, delivery, etc.


3. Purchasing Order : After the customer confirming the mould design and quotation.


4. Making mold(moulds): Confirm drawing, start to do DFM, mold flows and mold detail agreed with the customer, start producion.


5. Production schedule: Every week we will feedback to the customer about the mold progress(picture).


6. Sample shoot: We provide the moulds test samples for confirmation(about 10-15 piece), we will start mass


Pproduct Info


Plastic MaterialPP,ABS,PA66,PA6,PC,POM,PBT, PMMA, PPS, PPU,PPE,TPE, or other you want.
Plastic Surface finishPolishing finish,Texture Finish,Glossy Finish, Wooden finish, Painting,Slik print, VDI-3400
Drawing formatUG, IGES, STEP,x_t, AutoCAD, Solidworks,Catia, PTC Creo, DWG, PDF, etc..
CertificatedISO 9001, IATF 16949, ISO 14001
Range of marketsRadiator grille,Hood,Pillar,Outer mirror,Door moulding,Door trim,Inner panel,Seat, fuel tank valve, Air conditioner, housing, center console,Instrument panel, Horn,Air bag system, Cup holder, Key switch, Grating.
Mould Material2343, 2344, S136, 2085, 2738,M310,M333,W300,DC53,S-7, 8407, Unimax, Viking, SKD61, NAK80,H13,P20, 718,2767
Hot runnerSynventive, Incoe, HRS, moldmasters, HUSKY, EWIKON, Guenther.
Injection machine size45 ton, 80 ton, 120 ton, 160 ton, 220 ton, 300 ton, 400 ton, 650 ton, 850 ton, 1000 ton, 1750 ton
Cavity1,2,4,8,16,32


① Delivery Terms


FOB-XiaMen


② Payment Terms


T/T, 50% deposit, 30% after mold trial T1, 20% balance before shipment


③ Project Data


2D or 3D drawings should be provided by customer, should our team assist in modify of files or drawings,there maybe extra cost.


④ Lead time


DFM Report sumbit: 2-5 working days depends on the project. Mold Design:7-10 working days. FOT Time is Calculate from the date when customer approved the mold design.


⑤ Tolerance


Based on our general tolearance unless customers drawings with speicification.


⑥ Tooling Life guaranteed


Guaranteed: 1 million shots , guaranteed the period of 2 years after mold delivered.


⑦ Moldbase Steel Type


A & B Plate S136, Ejecctor Plate Top - P20, Ejector plate bottom - P20, others P20 Steel;


⑧ Moldbase Standard


LKM COPY Standard.(Purchase from Local manufacturer)


⑨ Moldbase Component


HASCO COPY standard.(Components are made in China, was not original standard)


⑩ Mold Component Standard


HASCO COPY standard.(Components are made in China, was not original standard)


⑪ Plastic Material for Trial


The resin for mold trial shall be supplied by customer and customer's duty on delivery to our factory, Unless otherwise specified.


Mold Trial Samples


Inclued Mold trial for 3 times, 10 shots for free charge each mold trial. The quotation will be offered for the extra parts if needed.


China PPE Plastic Injection Moulding Manufacturing Process High Productivity supplier

PPE Plastic Injection Moulding Manufacturing Process High Productivity

Inquiry Cart 0