

Add to Cart
Air craft plastic parts
Plastic Material:PPS,PPSU,PEI,PA,PC,ABS,TPE,POM, PEEK,PC/ABS,PBT
Plastic Surface finish:Polishing finish,Texture Finish, VDI-3400,Corn Blast,AL Oxide Dry Blast
Drawing format:UG, IGES, STEP,x_t, AutoCAD, Solidworks,Catia, PTC Creo, DWG, PDF, etc..
Certificated:PDF, etc..
Range of markets:injection plastic parts for aircraft seating,lighting system,in-flight TV,Oxygen Systems,Smoke detector,etc
Mould Material:2343, 2344, S136, 2085, 2738,M310,M333,W300,DC53,S-7, 8407, Unimax, Viking, SKD61, NAK80,H13,P20, 718,2767
Hot runner:Synventive, Incoe, HRS, moldmasters, HUSKY, EWIKON, Guenther,BHT
Injection machine size:30T-1750T
Cavities:1-64
Product Info
Product Name | OEM/ODM customzied rapid prototype mould manufacturer abs plastics
parts injection molding for small molded parts |
Plastic Material | PP, ABS, ABS+PC, PC, TPE/TPE, PA66/PA6, PMMA, PBT, HDPE, PE, POM,
PPS, PS |
Factory Certification | ISO9001:2015, SGS |
Plastic Certification | RoSH, SGS, food grade, Medical grade, UL, UV |
Mold building time | Mostly 4-5 weeks, can be flexible to meet with your urgent delivery |
Factory History | 18 years experience in plastic injection mold and clear/transparent
plastic parts molding. |
Surface Treatment | Texture, gloss, polishing, silk printing, painting, etc... |
Production time | After sample is confirmed, 2-3 weeks for mass production |
Production duration | 300000 shots to 1,000,000 Shots. |
Equipment | High speed CNC, Standard CNC, EDM, Wire Cutting, WEDM, Grinder,
Plastic Injection Molding Machine from 40-650T available. |
After sample is confirmed, 2-3 weeks for mass production | |
Production duration | 300000 shots to 1,000,000 Shots. |
Equipment | High speed CNC, Standard CNC, EDM, Wire Cutting, WEDM, Grinder,
Plastic Injection Molding Machine from 40-650T available. |
FAQ
Q1: Are you trading company or manufacturer ?
A: We are manufacturers.
Q2. When can I get the quotation?
A: We usually quote within 2 days after we get your inquiry.
If you are very urgent, please call us or tell us in your email so
that we can quote for you first.
Q3. How long is the lead-time for mold?
A: It all depends on the products' size and complexity. Normally,
the lead time is 15-25 days.
Q4. I have no 3D drawing, how should I start the new project?
A: You can supply us a molding sample, we will help you finish the
3D drawing design.
Q5. Before shipment, how to make sure the products quality?
A: If you don't come to our factory and also don't have the third
party for inspection, we will be as your inspection worker.
We will supply you a video for production process detail include
process report, products size structure and surface detail, packing
detail and so on.
Q6. What is your payment terms?
A: Mold Payment: 40% deposit by T/T in advance, 30% second mold
payment before sending out the first trial samples, 30% mold
balance after you agree the final samples.
B:Production Payment: 50% deposit in advance, 50% before sending
out the final goods.
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our
customers benefit for best quality products .
2. We respect every customer as our friend and we sincerely do
business and make friends with them, no matter where they come
from.