

Add to Cart
China Living Incinerator Machine Easy Operation Durable Used For Garbge Burning And Medical Waste
Application
Garbage incinerator is a device for incineration and disposal of
garbage. Garbage is burned in the furnace and becomes exhaust gas
into the secondary combustion chamber. It is completely burned
under the forced combustion of the burner, and then enters the
spray dust collector. After dust removal, it is discharged into the
atmosphere through the chimney. . The garbage incinerator consists
of four systems: garbage pre-treatment system, incineration system,
smoke biochemical dust removal system and gas generator (auxiliary
ignition incineration). It integrates automatic feeding, sieving,
drying, incineration, dust removal, dust removal, and automatic
control.
The garbage incinerator is a kind of harmless treatment equipment
commonly used in the harmless treatment of medical and domestic
wastes and animals. The principle is to use the combustion of coal,
oil, gas and other fuels to incinerate and carbonize the objects to
be treated at a high temperature to achieve the purpose of
disinfection.
Structure
Incinerator body primary combustion chamber, secondary combustion chamber, cyclone dust collector, chimney, flue, piping system, high pressure blower, auxiliary pressure induced draft fan, primary combustion machine, secondary combustion machine, electric control cabinet, temperature indicator Device, detection device, etc.
Parameters
Type | Main Size(mm) | Capacity(kg/ batch) | Inside volume(m3) | power consumption(kw/h) | fuel consumption(L/h) | Equioment Weight(t) |
ZTFS-25 | 1000X900X1700 | 25 | 2.5 | 2 | 3 | 1. 15 |
ZTFS-20-40 | 1200X1300X1800 | 20-40 | 3.0 | 2-4 | 3-8 | 2. 2-5.5 |
ZTFS-20-60 | 1700X1500X2100 | 20-60 | 5.0 | 2-5 | 3-10 | 4. 5-7. 8 |
ZTFS-50-120 | 2200X2000X2500 | 50-120 | 10.0 | 3-12 | 4-15 | 5.0-11. 5 |
ZTFS-100-300 | 3000X3500X2900 | 100-300 | 13.0 | 10-30 | 10-40 | 15-25 |
ZTFS-400-500 | 3000X3700X3200 | 400-500 | 17.0 | 40-50 | 50-60 | 30-45 |
Combustion process and brief description:
The waste is manually put into the primary combustion chamber of
the furnace body, and the automatic temperature control starts the
primary combustion. According to the principle of combustion three
T (temperature, time, vortex), it is fully oxidized, pyrolyzed and
burned in the furnace body combustion chamber. The flue gas
produced by incineration enters the second combustion chamber, and
the unburned harmful substances in the flue gas are further
destroyed in the second combustion chamber. In order to completely
decompose the unburned embers and meet the emission requirements,
the second combustion chamber is equipped with a burner to assist
combustion, and is equipped with a unique secondary air supply
device to ensure that the flue gas is in full contact with oxygen
at high temperatures, and at the same time to ensure that the flue
gas is in the second combustion chamber. The residence time of the
combustion chamber is adjusted according to the oxygen content of
the flue gas at the outlet of the second combustion chamber. The
temperature in the second combustion chamber is controlled and the
larger particles are removed by the dust collector, so that the
incineration efficiency and destruction removal rate can reach more
than 99%, so that it can achieve the effect of no odor, no odor and
smoke, and reach the national emission standard. It enters the
chimney and is discharged into the atmosphere, and the ashes
produced after combustion are manually taken out, screened,
transferred and buried.
Packing and Delivery
1. Waterproof packing with the international export standard by
20ft, 40ft, 40hp container. Equipment Fittings, Electric Motor and
Power Cabinet will be packed in Wooden Case or Iron Box. Other
Equipment will be packed by Color-Stripes Plastic Cloth.
2. The whole plant machinery size are large as normal, so we will
use Waterproof cloth to pack all of them. The motor, gear box or
other easily damaged parts, we will put them into box. We have a
professional shipping department, they will try their best to save
your container quantity.
FAQ:
Q: Are You Trading Company Or Manufacture?
A: We Are Both Manufacture And Trading Company. We Have Over 30
Years' Professional Experience As a Waste Water Treatment Equipment
Manufacturer And Engineering Service Enterprise.
Q : What Are Your Main Products?
A:Keywords :Sludge Dewatering Machine Equipment, Screw Type Sludge
Dewatering Press Sludge Screw Press, Dewatering Sludge Machine
Screw Press ,Sewage Treatment Equipment ,Sludge Treatment
Plant,Screw Press Sludge Dewatering ,Dewatering Sludge,Dewatering
Machine For Sludge, Dewatering Sludge Machine Screw Press, Rotary
Drum Bar Screens, Equipment DAF, DAF Price ,Dissolved Air Flotation
System Price, Sludge Shaftless Screw Conveyor,Chemical Dosing
Device ,MBBR Price,MBBR Media,Disc Diffuser, Polymer Preparation
Chemical Dosing System, and other customized machines.
Q: How Can I Find The Suitable Model?
A: Please Provide Flow Rate, Solids Content And Sludge Type, or
directly contact us by the clicking the “contact” icon. We Can
Assist You In Model Selection.