Add to Cart
Horizontal Metal or Rubber Liner Centrifugal Coal Washing Slurry Pump 8/6FF Polyurethane Pump
The Extra-Thick Wet End Components make the AH(R)GEM series
centrifugal horizontal slurry pump could handle the liquid with
abrasive solid particles and extend the wear life Max, increase the
mean time between failures with lowest maintenance by reasonable
component arrangement!!!
1. The Large diameter, slow turning, high efficiency impellers
designed to achieve maximum wear life and lowest maintenance
2. The Large, open internal passages designed to reduce internal
velocities, maximize wear life and lowest maintenance
3. Heavy duty construction with through-bolt design provides ease
of maintenance and Min downtime
4. The Replaceable and Interchangeable Wet End Parts are lower the
stocking cost, easy to repair and Min downtime
5. The Ductile iron fully lined casing provides
durability,strength, safety, and long service life recommended
while the Grey iron liner is the economic solution could satisfied
the most customers required especially when you dont need the pumps
work at 24x7
6. Minimal shaft/impeller overhang reduces shaft deflection and
increases packing life and the mean time between failures
7. Cartridge-style bearing assembly allows for maintenance in a
clean environment without removal of the pump, resulting in
reliable operation and prolonged bearing life, which is another way
to increase the mean time between failures
8. Grease or oil lubrication bearing assembly options offer ease of
maintenance and reduced downtime
9. Lower NPSH requirements results in enhanced hydraulic
performance and extended the wear life
10. The metal or rubber parts are available for different work
conditions Max the wear life and lowest the maintenance cost
Slurry Pump Application
The slurry pump could also be used in dredging of settling lagoons and pumping of drilling mud etc.
• Mining • Mineral processing • Construction • Chemical and Fertilization • Power generation | • Phosphate matrix fertilization • Paper mill wastes and liquors • Precipitated CaCO3 • Plaster • Bottom/fly ash, lime grinding | • Pulp and paper • Oil and gas • Waste water treatment • Dirty water • Waste sludge |
• Ball mill discharge • Rod mill discharge • SAG mill discharge • Fine tailings • Flotation • Heavy media process • Minerals concentrate • Mineral sands | • Coal-washing plant • Coarse sand • Coarse tailings • Dredging • FGD • Wet crushers pplications • Wet scrubber systems • Process chemical | • Iron and Steel • Ni acid slurry • Fracking slurries • Clay and sand slurries • Kaolin clay • Carbon slurry • Lime mud • Oil sands |
New development High Chrome Cast Iron make AH(R)GEM Mining Horizontal Centrifugal Slurry Pump have the long time use-life. In some conditions, the new development Rubber materials have better performance when there is acid conditions. You could also find some rubber lined pump for your different required!
Heavy Duty Slurry Pump Application:
AH(RG)GEM series slurry pump is widely used in metallurgy, mining,
mineral processing, dredging, de-watering, water treatment, coal
washing, mill, cyclone feed, tailing, power, building
material...etc. various industrial sites. HS pumps are called
different names for different working duties: Mineral processing
pump, Mill discharge slurry Pump, Booster pump, Feeding pump,
Tailing pump,Transfer pump Thickner Underflow Pump, De-watering
screen pump, Pressure pump, Concentrate pump...
FAQ
Q:Can you supply pump qualified with ANSI and ASME standard?
A:Yes, our pump compliant with ISO / ASME/ANSI standard.
Q:How to customize pumps and mechanical seals ?
A:Customers could send us application data, we will select suitable
pump and seal types, or client could send us drawings, We are well
in OEM and ODM.
Q:How can I pay for my items? What is the payment you can provide?
A:Usually by T/T, 30% down payment once PI confirmed, the balance
will be paid after inspection and before shipment. L/C at sight
Q:How long is warranty?
A:1 year for main construction warranty.
Q:How long is production lead time?
A:Normally 5 working days. If client need urgently, we have a huge
spare parts stock, we could finish assembly and testing in 3 days.