

Add to Cart
High Speed Wire Rod 45 Degree Non-twisting Finishing Mill
Wire rod mill is a rolling mill specially used for rolling wire rod (ie wire rod). Wire rod is the product with the smallest interrupted surface size of the profile. Rolled from the billet to the finished product, the total elongation coefficient is large. The rolled piece is often rolled only once on each mill. Therefore, the wire rod mill has the largest number of stands and the smallest division of labor among the hot-rolled profiles. Mill. At present, modern continuous wire rod rolling mills generally consist of 21 to 28 rolling mills, which are divided into rough rolling mills, intermediate rolling mills, and finishing mills. The intermediate rolling mills are sometimes divided into two groups: one intermediate rolling mill and two intermediate rolling mills. The structure and layout of wire rod mills have been developing in the direction of high speed, continuous, non-twist, single wire, combined structure, mechanization, and automation.
Features:
(1) It has high dimensional accuracy and small ellipticity;
(2) it adopts distributed coil wind cooling, its composition is
uniform, good mechanical properties;
(3) because of the use of negative tolerance rolling, it saves
metal, the same weight of the high wire is longer than the general
line length;
(4) Each piece has only one head and tail;
(5) the high line is generally more expensive than the general line
20~40 yuan /t.
Product details of steel ribbed bar hot rolling mill machine
Commodity | Small Hot Rolling Mill Production Line |
Feed section | 50*50mm |
Rolling capacity | 3T/H |
Cooling way | Water cooling for rolling mill machine |
Service | Provide long-term technical support |
After-sales service provided | Engineers available to service machinery overseas |
Application | Used in foundry |
Rolling specification | <100*10 |
Keyword | Hot rolling mill |
Rolling speed | 1.8-2.5m/s |
Selling Units: Single item
Single package size: 150*100*170cm
Single gross weight: 100,000kg
Package Type: Safety Seaworthy Package
Lead Time:
Quantity (Tons) | 1-100 | >100 |
Est. Time(Days) | 60 | To be negotiated |